Lean Six Sigma Black Belt Upgrade

Reducing “The Waste” with Lean Six Sigma

ABOUT THE PROGRAM

An organisation while producing may have some processes in the production line which seem unwanted at some stage. There is a requirement to eliminate such waste processes from project environment as unwanted processes cause delay in to the production line. The Lean Six Sigma methodology is used to identify and eliminate extra processes. We at MSP Training train delegates with Lean Six Sigma methodology through Lean Six Sigma Black Belt Upgrade course. Our instructors are Lean Six Sigma certified professionals.

  • The Lean Six Sigma Certifications are delivered by experienced and certified professionals

  • Understand the principals that lie behind Lean Six Sigma methodology

  • A Majority of the industry supports Lean Six Sigma to achieve its goals

  • Lean Six Sigma is not industry specific

  • Get higher salaries and perks as Lean Six Sigma professionals.

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Exam(s) included

Exams are provided, as part of the course. Obtaining certification is dependant on passing these exams

Includes

Certificate

Delegates will get certification of completion at the end of the course.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

The delegate must hold a Green Belt Certification to be elligible for the Black Belt certification exam.

TARGET AUDIENCE

  • Lean Six Sigma Green Belt Certified Professionals
  • Green Belt Professionals who are interested in improving the organisation's productivity through the use of Lean Six Sigma principals and methodologies
  • Experienced Black Belt professionals who want to upgrade themselves to the latest concepts

WHAT WILL YOU LEARN?

  • Use the DMAIC tools and the complications that may arise out of them.
  • Find solutions to the DMAIC project problems
  • Learn to manage issues with the team
  • Work at different levels in a team
  • Analyse the relation between input and outputs of the processes

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

There are 8 kinds of wastes that an organisation may face. They are described as “DOWNTIME” – an acronym for

  • D – Defective Processes
  • O – Overprocessing
  • W – Waiting Period
  • N – Non-Used Employee Talent
  • T – Transport
  • I – Inventory
  • M – Motion
  • E – Excess Production

To avoid the problems caused by DOWNTIME, Lean Six Sigma recommends the 5s technique which every Lean Six Sigma professional is familiar with. This 5s technique is made up of the following 5 steps (names provided both in English as well as Japanese)

  • Sort (Seiri)
  • Straighten (Seiton)
  • Shine(Seiso)
  • Standardise(Seiketsu)
  • Sustain(Shitsuke)

The first step, Sort, makes work easier as it eliminates the obstacles and reduces the chances of being disturbed with unnecessary items. It also removes unwanted processes or items that are not required in the production phase.

The second step, Straighten, arranges all items in a first cum first serve basis so as to easily select them for use. The third step, Shine, focuses on keeping the workplace clean such that any kind of machinery is not affected. The fourth step, Standardize, selects the best steps to be followed for the production. The last step, Sustain, refers to keeping everything in order and also make sure that standards are implemented.

In any organisation, during the production process, waste is bound to occur. Generally, this can happen as unnecessary steps creeping into the production line or processes executing with varying times. Both ways the production is affected and organisation will go into a loss. Implementation of Lean Six Sigma methods help the organisations out of such conditions. Lean Six Sigma has three levels that professionals can take up starting from the Yellow Belt, into the Green Belt and finally the Black Belt. However, there is a fourth course that is offered by Lean Six Sigma – the Lean Six Sigma Black Belt Upgrade course. This course focuses on professionals who are already Green Belt Professionals and want to upgrade to Black Belt. Unlike the Black Belt course, the Upgrade version for the same does not teach the concepts of Green Belt before going into the Black Belt course.

Exam

A delegate must attempt 100 questions in the Lean Six Sigma Black Belt Upgrade exam. A minimum of 70% marks is required to get the certification. The language of the exam is English. In case the delegates require any other information they will be provided with the same by the examiner just before the exam.


PROGRAM CONTENT

Part one:

  • Review Green Belt  principals
  • Describe Project Charters or Workshop
  • What are required jobs?
  • What are expectations on results?
  • What is Minitab?
  • Basic Statistics 2
  • Project Report Outs
  • Daily Tech backs
  • Define Change Management
  • Exercise based on Value Stream Mapping
  • Project Management
  • Measurement System Analysis
    • Attribute Agreement Analysis
    • Continuous Data
  • Capability Analysis
    • Attribute Data
    • Continuous Normal Data
    • Continuous Non-normal D

Part 2:

    • Reviews of Project
    • Review of Assumption Testing
    • Methods and Techniques of Minitab Graphical
    • Flow Review
    • Central Limit Theorem
    • Confidence Intervals
    • Pull Review
    • Mean & Variance Tests
    • Proportions Testing
    • Contingency Tables GOF
    • Sample Size Selection
    • Correlation/Linear Regression
    • One Way ANOVA
    • Improving Phase Roadmap
    • Getting Familiar With Design of Experiments (DOE)
    • Full Factorial Designs
    • 2K Factorial Designs
    • Attribute DOE
    • Project Reviews

    Part 3:

    • 2K Fractional DOE Designs
    • Simulation Exercise DMAIC / DOE
    • Logistic Regression – An Introduction
    • Advanced Regression
    • Introduction to Control Charts
    • Variable SPC Techniques
    • Attribute SPC Techniques
    • Control Methods
    • Introducing  Surveys
    DMAIC Review & Final Reports

Lean Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Doncaster

Doncaster is a place where markets were organised in the past. It was not mandatory at all for the smooth conduct of the market, but it has potential to hold a fair was also termed as Market town. The geographical location is near to South Yorkshire territory of the United Kingdom. With the geographical area of nearby suburbs and settlements, it forms a Metropolitan Borough of Doncaster. As per the population census of mid-2016, the population was 306,450. The only territory of the Doncaster contributes 109,810 population. As per the Treaty of Durham,  its Jurisdiction comes from the Scotland. The urban vicinity of the region contributes 158,145 people including the nearby villages.

Politics

There are three seats for the member of parliament in the Doncaster constituency. The constituency is currently under the power of Caroline Flint(Don Valley), Ed Miliband(Doncaster North), and Rosie Winterton(Doncaster Central). At a European level,  The city was a part of European Parliament Constituency. In September 2014, UklP organised yearly conclave. In the European Union Referendum 2016, Doncaster was in favour of leaving the European Union.

Geography     

With the development of the Coal Mining sector, the population of the borough expanded at a very rapid pace. In the late of 1970 and the beginning of 1980, it faced a lot of problem in the economic sector of the town. There have been lost in the job opportunities of the city. There has been a drastic shift towards the service industry of the city. The city has an excellent link with the rest of the United Kingdom owing to the communication links of it. There has been a destination where tourists come from all over the world, i.e. Frenchgate Shopping Centre.

Climate

Doncaster has a coastal climatic condition, and it lacks in the extreme temperature conditions. There has not been much difference between the maximum temperature as well as the lower temperature. RAF Finningley is the official weather station for the town.

Economy        

From the 18th century to 20th century, Doncaster was the major industrial centre among the nearby cities. It attracted visitors from all over the world, and it became extremely busy and experienced migration in the past. In nowadays, the city experiences development in commercial and residential wise.  

Tractor production      

During the 1930’s, International Harvester initiated the production of agricultural tools and implements at their manufacturing units. Farmall M was the first tractor manufactured in the unit on 13th September 1949. The initial parts for the manufacturing of tractors came from the United States of America

Transport

Doncaster is situated at the beginning of the European Route E13. Other main cities that are connected with it are London, Nottingham, and Sheffield. The unusual thing is that there is not a single European route designator in the street of the United Kingdom. The Initial Point of M1 motorway is M18 Junction 2 of Doncaster

Culture, tourism, and Nightlife

Doncaster Museum and Art Gallery are only renowned museums opened in 1964. It has been the home of local history, natural history, archaeology and decorative art. A lot of visitors visit the city during the weekend.

The nightlife of the city is appreciated nearby region. This town has 43 bars and clubs. It is just 200 to 300 meters distance from each other

Sports  

The City provides a lot of opportunities in sports and games. The City is famous for many games such as horse races, rugby football, soccer game and Speedway Racing. The basketball game is also played by few clubs though followed much by the native people. The city also has twin town in different countries such as Avion, France and Herten, Germany

 

Lean Six Sigma

What is Le...