Lean Six Sigma Black Belt Upgrade

Reducing “The Waste” with Lean Six Sigma

ABOUT THE PROGRAM

An organisation while producing may have some processes in the production line which seem unwanted at some stage. There is a requirement to eliminate such waste processes from project environment as unwanted processes cause delay in to the production line. The Lean Six Sigma methodology is used to identify and eliminate extra processes. We at MSP Training train delegates with Lean Six Sigma methodology through Lean Six Sigma Black Belt Upgrade course. Our instructors are Lean Six Sigma certified professionals.

  • The Lean Six Sigma Certifications are delivered by experienced and certified professionals

  • Understand the principals that lie behind Lean Six Sigma methodology

  • A Majority of the industry supports Lean Six Sigma to achieve its goals

  • Lean Six Sigma is not industry specific

  • Get higher salaries and perks as Lean Six Sigma professionals.

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Exam(s) included

Exams are provided, as part of the course. Obtaining certification is dependant on passing these exams

Includes

Certificate

Delegates will get certification of completion at the end of the course.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

The delegate must hold a Green Belt Certification to be elligible for the Black Belt certification exam.

TARGET AUDIENCE

  • Lean Six Sigma Green Belt Certified Professionals
  • Green Belt Professionals who are interested in improving the organisation's productivity through the use of Lean Six Sigma principals and methodologies
  • Experienced Black Belt professionals who want to upgrade themselves to the latest concepts

WHAT WILL YOU LEARN?

  • Use the DMAIC tools and the complications that may arise out of them.
  • Find solutions to the DMAIC project problems
  • Learn to manage issues with the team
  • Work at different levels in a team
  • Analyse the relation between input and outputs of the processes

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

There are 8 kinds of wastes that an organisation may face. They are described as “DOWNTIME” – an acronym for

  • D – Defective Processes
  • O – Overprocessing
  • W – Waiting Period
  • N – Non-Used Employee Talent
  • T – Transport
  • I – Inventory
  • M – Motion
  • E – Excess Production

To avoid the problems caused by DOWNTIME, Lean Six Sigma recommends the 5s technique which every Lean Six Sigma professional is familiar with. This 5s technique is made up of the following 5 steps (names provided both in English as well as Japanese)

  • Sort (Seiri)
  • Straighten (Seiton)
  • Shine(Seiso)
  • Standardise(Seiketsu)
  • Sustain(Shitsuke)

The first step, Sort, makes work easier as it eliminates the obstacles and reduces the chances of being disturbed with unnecessary items. It also removes unwanted processes or items that are not required in the production phase.

The second step, Straighten, arranges all items in a first cum first serve basis so as to easily select them for use. The third step, Shine, focuses on keeping the workplace clean such that any kind of machinery is not affected. The fourth step, Standardize, selects the best steps to be followed for the production. The last step, Sustain, refers to keeping everything in order and also make sure that standards are implemented.

In any organisation, during the production process, waste is bound to occur. Generally, this can happen as unnecessary steps creeping into the production line or processes executing with varying times. Both ways the production is affected and organisation will go into a loss. Implementation of Lean Six Sigma methods help the organisations out of such conditions. Lean Six Sigma has three levels that professionals can take up starting from the Yellow Belt, into the Green Belt and finally the Black Belt. However, there is a fourth course that is offered by Lean Six Sigma – the Lean Six Sigma Black Belt Upgrade course. This course focuses on professionals who are already Green Belt Professionals and want to upgrade to Black Belt. Unlike the Black Belt course, the Upgrade version for the same does not teach the concepts of Green Belt before going into the Black Belt course.

Exam

A delegate must attempt 100 questions in the Lean Six Sigma Black Belt Upgrade exam. A minimum of 70% marks is required to get the certification. The language of the exam is English. In case the delegates require any other information they will be provided with the same by the examiner just before the exam.


PROGRAM CONTENT

Part one:

  • Review Green Belt  principals
  • Describe Project Charters or Workshop
  • What are required jobs?
  • What are expectations on results?
  • What is Minitab?
  • Basic Statistics 2
  • Project Report Outs
  • Daily Tech backs
  • Define Change Management
  • Exercise based on Value Stream Mapping
  • Project Management
  • Measurement System Analysis
    • Attribute Agreement Analysis
    • Continuous Data
  • Capability Analysis
    • Attribute Data
    • Continuous Normal Data
    • Continuous Non-normal D

Part 2:

    • Reviews of Project
    • Review of Assumption Testing
    • Methods and Techniques of Minitab Graphical
    • Flow Review
    • Central Limit Theorem
    • Confidence Intervals
    • Pull Review
    • Mean & Variance Tests
    • Proportions Testing
    • Contingency Tables GOF
    • Sample Size Selection
    • Correlation/Linear Regression
    • One Way ANOVA
    • Improving Phase Roadmap
    • Getting Familiar With Design of Experiments (DOE)
    • Full Factorial Designs
    • 2K Factorial Designs
    • Attribute DOE
    • Project Reviews

    Part 3:

    • 2K Fractional DOE Designs
    • Simulation Exercise DMAIC / DOE
    • Logistic Regression – An Introduction
    • Advanced Regression
    • Introduction to Control Charts
    • Variable SPC Techniques
    • Attribute SPC Techniques
    • Control Methods
    • Introducing  Surveys
    DMAIC Review & Final Reports

Lean Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Slough

Slough is a large town in the area of Berkshire, England. It is the junction point for many other towns. It gives an easy access to various directions and cut short time for many hours. It makes a piece of cake for travellers to reach from one end to another end. Due to M4, M40, and M25, it has the route to the rest of the United Kingdom. We can reach to London and Thames valley via Slough. The earlier Western Mainline which historically belonged to Buckinghamshire under demographic changes comes under slough region. There is an introduction of Elizabeth line which provides a fast journey to the travellers. It will cut the duration of the journey by a quarter of the time. As per 2016 census, the population of the town is 1 lakh 61 thousand.

Since the 19th century, there has been a large migration of the Labour in the town which ultimately facilitate the trade here and thus it leads to lessening unemployment. This workforce also plays a crucial role in becoming the major trading Centre. It has also very less unemployed rate. After the London, the slough is considered to be the most favoured destination for the corporate world. South town F.C is the famous football club of this region. According to 2011 census, there was drastically change in the demography of the area. It is considered to be the most diverse as far as ethnicity is to be concerned. All the major companies’ offices such as Blackberry, McAfee, Burger King, LEGO and much more have their head offices in the city. Every year thousands of jobs have been provided by the Trading Estate business. Slough per capita income is also high.

History

Starting from the origin of the name, it comes from the soil. It was first used in the late 11th century. During the 13th century, the king lived in Chippenham palace. In the 13th century, the upper portion of Court was built. The sacred St Mary the Virgin church, has been under renovation several times in the past. There was an immediate railway started for the convenience of Queen from Slough railway station to Windsor. During the First World War, a largely unused, as well as agricultural land, was used as a depot to repair army vehicles in short period time. During Second World War, major air strikes happened to destroy the linkage between the towns. The hearth of the slough is the biggest ever development plan for the 21st century. Slough has hundreds of buildings which have some historical importance.

Geography and Climate

The ancient part of the Buckinghamshire is known as slough. It got expanded and developed by the nearby villages of the Great West road. The London Heathrow airport gives update information from time to time regarding change of prevailing weather condition. The part of Thames valley experiences high temperature. In contrast to this, the rainfall is comparatively low to 600mm annually. It gives updated information on the prevailing weather condition to local people.

Demography

During the 1930s, it became a safe haven for most of the unemployed youth of the nearby region. They came here looking for jobs and this town gave them the respective opportunity. As per 2011 census, 45% population are white.  A large part of immigrants of various countries is as follow India 11,544, Pakistan 11,244 and Poland with 8,341 and a few more to follow.

Transport

It is very near to London and also has a large network of the roads throughout the city. One can go to different 5 directions at the same time from one point. It is also well connected with the railway. A route was constructed for cyclists too.

Lean Six Sigma

What is Le...