Lean Six Sigma Black Belt Upgrade

Reducing “The Waste” with Lean Six Sigma

ABOUT THE PROGRAM

An organisation while producing may have some processes in the production line which seem unwanted at some stage. There is a requirement to eliminate such waste processes from project environment as unwanted processes cause delay in to the production line. The Lean Six Sigma methodology is used to identify and eliminate extra processes. We at MSP Training train delegates with Lean Six Sigma methodology through Lean Six Sigma Black Belt Upgrade course. Our instructors are Lean Six Sigma certified professionals.

  • The Lean Six Sigma Certifications are delivered by experienced and certified professionals

  • Understand the principals that lie behind Lean Six Sigma methodology

  • A Majority of the industry supports Lean Six Sigma to achieve its goals

  • Lean Six Sigma is not industry specific

  • Get higher salaries and perks as Lean Six Sigma professionals.

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Exam(s) included

Exams are provided, as part of the course. Obtaining certification is dependant on passing these exams

Includes

Certificate

Delegates will get certification of completion at the end of the course.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

The delegate must hold a Green Belt Certification to be elligible for the Black Belt certification exam.

TARGET AUDIENCE

  • Lean Six Sigma Green Belt Certified Professionals
  • Green Belt Professionals who are interested in improving the organisation's productivity through the use of Lean Six Sigma principals and methodologies
  • Experienced Black Belt professionals who want to upgrade themselves to the latest concepts

WHAT WILL YOU LEARN?

  • Use the DMAIC tools and the complications that may arise out of them.
  • Find solutions to the DMAIC project problems
  • Learn to manage issues with the team
  • Work at different levels in a team
  • Analyse the relation between input and outputs of the processes

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

There are 8 kinds of wastes that an organisation may face. They are described as “DOWNTIME” – an acronym for

  • D – Defective Processes
  • O – Overprocessing
  • W – Waiting Period
  • N – Non-Used Employee Talent
  • T – Transport
  • I – Inventory
  • M – Motion
  • E – Excess Production

To avoid the problems caused by DOWNTIME, Lean Six Sigma recommends the 5s technique which every Lean Six Sigma professional is familiar with. This 5s technique is made up of the following 5 steps (names provided both in English as well as Japanese)

  • Sort (Seiri)
  • Straighten (Seiton)
  • Shine(Seiso)
  • Standardise(Seiketsu)
  • Sustain(Shitsuke)

The first step, Sort, makes work easier as it eliminates the obstacles and reduces the chances of being disturbed with unnecessary items. It also removes unwanted processes or items that are not required in the production phase.

The second step, Straighten, arranges all items in a first cum first serve basis so as to easily select them for use. The third step, Shine, focuses on keeping the workplace clean such that any kind of machinery is not affected. The fourth step, Standardize, selects the best steps to be followed for the production. The last step, Sustain, refers to keeping everything in order and also make sure that standards are implemented.

In any organisation, during the production process, waste is bound to occur. Generally, this can happen as unnecessary steps creeping into the production line or processes executing with varying times. Both ways the production is affected and organisation will go into a loss. Implementation of Lean Six Sigma methods help the organisations out of such conditions. Lean Six Sigma has three levels that professionals can take up starting from the Yellow Belt, into the Green Belt and finally the Black Belt. However, there is a fourth course that is offered by Lean Six Sigma – the Lean Six Sigma Black Belt Upgrade course. This course focuses on professionals who are already Green Belt Professionals and want to upgrade to Black Belt. Unlike the Black Belt course, the Upgrade version for the same does not teach the concepts of Green Belt before going into the Black Belt course.

Exam

A delegate must attempt 100 questions in the Lean Six Sigma Black Belt Upgrade exam. A minimum of 70% marks is required to get the certification. The language of the exam is English. In case the delegates require any other information they will be provided with the same by the examiner just before the exam.


PROGRAM CONTENT

Part one:

  • Review Green Belt  principals
  • Describe Project Charters or Workshop
  • What are required jobs?
  • What are expectations on results?
  • What is Minitab?
  • Basic Statistics 2
  • Project Report Outs
  • Daily Tech backs
  • Define Change Management
  • Exercise based on Value Stream Mapping
  • Project Management
  • Measurement System Analysis
    • Attribute Agreement Analysis
    • Continuous Data
  • Capability Analysis
    • Attribute Data
    • Continuous Normal Data
    • Continuous Non-normal D

Part 2:

    • Reviews of Project
    • Review of Assumption Testing
    • Methods and Techniques of Minitab Graphical
    • Flow Review
    • Central Limit Theorem
    • Confidence Intervals
    • Pull Review
    • Mean & Variance Tests
    • Proportions Testing
    • Contingency Tables GOF
    • Sample Size Selection
    • Correlation/Linear Regression
    • One Way ANOVA
    • Improving Phase Roadmap
    • Getting Familiar With Design of Experiments (DOE)
    • Full Factorial Designs
    • 2K Factorial Designs
    • Attribute DOE
    • Project Reviews

    Part 3:

    • 2K Fractional DOE Designs
    • Simulation Exercise DMAIC / DOE
    • Logistic Regression – An Introduction
    • Advanced Regression
    • Introduction to Control Charts
    • Variable SPC Techniques
    • Attribute SPC Techniques
    • Control Methods
    • Introducing  Surveys
    DMAIC Review & Final Reports

Lean Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Wakefield

Wakefield is a city in England. The river Calder flows in the vicinity of the city. The city of Wakefield is a Metropolitan borough that comes under West Yorkshire, country and the Humbler region of England. The city is dubbed as Merrie City and a quick market town and large city. It is famous for the well-served flesh of both sea and Rivers. It is recognised as the compassion city as seafood is very cheap to fulfil stomach. The facilitation of the fish food is very fast and easily available. Coal is also another important mineral found in the region. During civil war era, it was also a stronghold for Royalist. It evolved as major market and Centre for wool. It transformed into an Inland port from a normal navigable river. The post town is Wakefield.

History

The origin of the name was supposed to come from Waca’s field. Here Waca’s means a watch or wake. Here the field refers to an open ground where festivals were supposed to be organised. Because of this, it got this beautiful name of Wakefield. The origin of the town is to nearly 5th or 6th century. During AD 876, the region was under the control of Vikings. He also played a crucial role in the foundation of twelve hamlets. After the battle of Hastings, the area was conquered by William the Conqueror from Edward the Confessor. During mid-18th century there was an introduction of the railway. At the beginning of the 19th century, the town got multifold income in its basket. Large warehouses were built for the storage of grains in the region. At the later stage, Glass and Textile industries also got pace.

Governance

In the earlier years, it was a town with one seat for Member of Parliament. For 20 years, it had run by Yorkshire government. During 1913, it got the status of the city. The city council runs its administration from the country hall as its office. The seat of the MP has been reserved with Labour party for 12 years.

Geography and Demography

The average high climate temperature of the town is 13° Celsius and average low temperature is 6.3°Celsius.It got average rainfall from 800mm to 900 mm. The last Population census of the Wakefield came in 2001. The urban area had population 77 thousand approximately. The sex ratio of the Wakefield has the good number. Approximately, 40% people did not go to school or college and do not have any academic qualification. The people of Asia continent is in minority here. The white people have the majority in the region with 91% strength followed by Asian and black communities.

Education

The oldest school of the region is Queen Elizabeth Grammar school. The Elizabeth gallery is moved to Northgate in mid- 18th century. The governor is responsible for the administration of the school. The Church of England opened several National schools in mid-18 century. Wakefield College is the leading institution with 3000 full time and 10,000 part time students in its basket. The standard of education appreciated by local people.

Transport 

The junction point of the M1 and M62 motorways provides good access to commuters. There is a number of roads passes through the city. Wakefield Kirkgate operates trains in the region. There is also a vast network of trains in the city. 

Notable people

The veteran Novelist George Gissing was born in 1857. The famous Sculptor Barbara Hepworth is another name in the list. ‘‘This sporting life’’ book writer David Storey was also born here. some other famous personalities also associated with this town.

Lean Six Sigma

What is Le...