Lean Six Sigma Black Belt

Increasing Organisational Profits with Lean Six Sigma

ABOUT THE PROGRAM

As of now the concept of “Customer is King” is held in high esteem by all organisations. To please the customer, the focus is on reducing delivery time. As they say “Time Saved is Money Saved”. Lean Six Sigma is an approach that removes any extra unwanted processes, saves resources and time and makes the entire process streamlined. Lean Six Sigma optimizes organisational processes to increase productivity.

At MSP Training, we ensure the delegates get trained in the concepts of Lean Six Sigma and they are able to cope up with the problems they face in real-time situations at their organisation. The Lean Six Sigma Black Belt training helps the delegates to learn Lean concepts so that they are able to lead a team of professionals during project execution.

  • Using Lean Methodology, decrease Waste Processes and increase Productivity.

  • Lean Six Sigma Certification is not focused to just one particular industry.

  • Experienced and certified instructors to impart knowledge to the delegates during the course

  • Major industries recognize Lean Six Sigma Black Belt Certification

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

  • A Green Belt certification
  • Experience of a Green Belt project

TARGET AUDIENCE

  • Green Belt Certified Professionals
  • Project Managers

WHAT WILL YOU LEARN?

After the completion of the course, the delegates will get expertise of the following concepts:

  • Project planning.
  • Determining and managing requirements of stakeholders.
  • How to improve various tools used for gauging and analysing business processes.
  • To determine a customer’s value make use of Lean concepts
  • The delegates learn to implement perfection by the use of low develop pull system.
  • Analyse, Quantify and Choose the best available solutions
  • Understand Process Change
  • Control Business Processes
  • Manage Green Belt Projects

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The concept of Lean aims at removing the waste processes due to which the project tends to divert away from its scope. Six Sigma, on the other hand, reduces processes variations and couples the processes together more tightly.

In the line of Lean Six Sigma, Lean Six Sigma Black Belt is the one that excels among all. Anybody interested in going through this course must be familiar with the concepts of Lean Six Sigma Green Belt. A Lean Six Sigma Black Belt certified professional leads a team of professionals who are already certified as Green Belt professionals.

IASSC (International Association for Six Sigma Certification™), the only third-party certification authority for Lean Six Sigma, certifies the delegates after passing an examination.

Exam

Exam Type: Closed Book Proctored Exam

Duration: 240 minutes

Questions: 150 Multiple Choice Questions

 


PROGRAM CONTENT

    • Define Phase
      • The Basics of Six Sigma
        • Meanings of Six Sigma
        • General History of Six Sigma & Continuous Improvement
        • What Does A Lean Six Sigma Project Deliver
        • The Problem Solving Strategy Y = f(x)
        • Voice of the Customer, Business and Employee
        • Six Sigma Roles & Responsibilities
      • The Fundamentals of Six Sigma
        • Defining a Process
        • Serious Quality Characteristics (CTQ’s)
        • Poor Quality Cost
        • The Pareto Analysis (80:20 rule)
        • Six Sigma - Measurement Standards
      • Selecting Lean Six Sigma Projects
        • Building a Business Case & Project Charter
        • Developing Project Metrics
        • Financial Evaluation & Benefits Capture
      • Undestanding The Lean Enterprise
        • Lean – An Understanding and its History
        • The Combination of Lean & Six Sigma
        • The Seven Waste Elements
        • 5S
          • Define Straighten, Shine, Standardize, Self-Discipline, Sort

     

    • Measure Phase
      • Process Definition
        • Cause & Effect / Fishbone Diagrams
        • Process Mapping, SIPOC, Value Stream Map
        • X-Y Diagram
        • Failure Modes & Effects Analysis (FMEA)
      • Six Sigma Statistics
        • Basic Statistics
        • Descriptive Statistics
        • Normal Distributions & Normality
        • Graphical Analysis
      • Measurement System Analysis
        • Precision & Accuracy
        • Bias, Linearity & Stability
        • Gage Repeatability & Reproducibility
        • Variable & Attribute MSA
      • Process Capability
        • Capability Analysis
        • Concept of Stability
        • Attribute & Discrete Capability
        • Monitoring Techniques
      • Analyze Phase
        • Patterns of Variation
          • Multi-Vari Analysis
          • Classes of Distributions
        • Inferential Statistics
          • Understanding Inference
          • Sampling Techniques & Uses
          • Central Limit Theorem
        • Hypothesis Testing
          • General Concepts & Goals of Hypothesis Testing
          • Significance; Practical vs. Statistical
          • Risk; Alpha & Beta
          • Types of Hypothesis Test
        • Hypothesis Testing with Normal Data
          • 1 & 2 sample t-tests
          • 1 sample variance
          • One Way ANOVA
        • Hypothesis Testing with Non-Normal Data
          • Mann-Whitney
          • Kruskal-Wallis
          • Mood’s Median
          • Friedman
          • 1 Sample Sign
          • 1 Sample Wilcoxon
          • One and Two Sample Proportion
          • Chi-Squared (Contingency Tables)
        • Improve Phase
          • Simple Linear Regression
            • Correlation
            • Regression Equations
            • Residuals Analysis
          • Multiple Regression Analysis
            • Non- Linear Regression
            • Multiple Linear Regression
            • Confidence & Prediction Intervals
            • Residuals Analysis
            • Data Transformation, Box Cox
          • Designed Experiments
            • Experiment Objectives
            • Experimental Methods
            • Experiment Design Considerations
          • Full Factorial Experiments
            • 2k Full Factorial Designs
            • Linear & Quadratic Mathematical Models
            • Balanced & Orthogonal Designs
            • Fit, Diagnose Model and Center Points
          • Fractional Factorial Experiments
            • Designs
            • Confounding Effects
            • Experimental Resolution
          • Control Phase
            • Lean Controls
              • Control Methods for 5S
              • Kanban
              • Poka-Yoke (Mistake Proofing)
            • Statistical Process Control (SPC)
              • Data Collection for SPC
              • I-MR Chart
              • Xbar-R Chart
              • U Chart
              • P Chart
              • NP Chart
              • Xbar-S Chart
              • CumSum Chart
              • EWMA Chart
              • Control Methods
              • Control Chart Anatomy
              • Subgroups, Impact of Variation, Frequency of Sampling
              • Center Line & Control Limit Calculations
            • Six Sigma Control Plans
              • Cost Benefit Analysis
              • Elements of the Control Plan
    Elements of the Response Plan

Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Belfast

Belfast is the largest city in the northern part as well as the second largest city in the whole Ireland region. It is also the capital city. It got the status of the city during late 18th century. The city was the hub of the Irish linen suit, rope-making, tobacco-processing and shipbuilding industries. RMS Titanic recognised as the world’s biggest as well as beneficial shipyard. Belfast played a crucial role in the industrial revolution and emerged as world’s Industrial hub during late 20th century. In mid of the 1930s, the city continued a major aerospace and missiles industry. Also, the city is a centre for business, higher education, arts, law and much more.

George Best and Belfast International Airport’s are giving their services to the city. Belfast Lough is dominated by the commercial and industry docks  

Governance

In 1613, the borough status to the Belfast was given by James VI and I and In 1888 it got the official city status by Queen Victoria. The city is governed by Belfast City Council and is part of local government district council as well. It is being represented in both the Northern Ireland Assembly and British House Of Commons. Belford comes under Northern Ireland constituency during the elections to the European Parliament.

Geography

Belfast located on the western side of Belfast Lough and the mouth of the Lagan River. This location is ideal for the shipbuilding industry. Wolff and Harland had the most significant shipyard in the world when the Titanic was built. At the time of winter solstice which the shortest day of the year, the sun rises around 08:45 and sunset before 16:00.  

Climate

Belfast has a marine climate similar to the rest of the Ireland. The difference seen in the day-night temperature is very less. Because of the warming effect of Gulf Stream, the temperature of Belfast is milder as compared to any other location. Currently, there is five weather observing stations in the Belfast that are Stormont, Newforge, Castlereagh, Helens Bay and Ravenhill Road. The hottest night of Belfast is recorded as 19.6 °C in August 2001 at Whitehouse.

Areas and Districts

During the 19th century, Belfast had grown rapidly from a market town to an industrial city. The city is gifted by natural hills that surround it and ultimately increase the beauty of the town. Furthermore, it helps in the tourism sector of the city. The city centre of Belfast is divided into two postcode districts. These are BT1 (for the north hall) and BT2( for the south hall). The number of tourists is continuously increasing since 2001. For this, cultural quarters have been developed by the city council. It really helps in the economy of the city as local people expanded their business and earning their livelihood. The name of the Cathedral Quarter has been taken from the name of St Anne’s Cathedral.

One of the main outdoor venues is Custom House Square. It is considered as the best place for free concerts and street entertainment. Apart from the communication channel, the Irish language is highly promoted and encouraged in the area of Gaeltacht quarter in west Belfast.

Demography

The population census conducted in the year of 2011, and the population was 276,459. This strength of people makes it the fifteenth-largest city and eleventh-largest conurbation in the England. As per the records, the first half of 20th century, the city experienced a massive growth in population. This arose issues related to administration during 1971 as the town was lacking with facility and infrastructure. But with the time, the development works also got pace and situation got well.

 

Lean Six Sigma

What is Le...