Lean Six Sigma Black Belt

Increasing Organisational Profits with Lean Six Sigma

ABOUT THE PROGRAM

As of now the concept of “Customer is King” is held in high esteem by all organisations. To please the customer, the focus is on reducing delivery time. As they say “Time Saved is Money Saved”. Lean Six Sigma is an approach that removes any extra unwanted processes, saves resources and time and makes the entire process streamlined. Lean Six Sigma optimizes organisational processes to increase productivity.

At MSP Training, we ensure the delegates get trained in the concepts of Lean Six Sigma and they are able to cope up with the problems they face in real-time situations at their organisation. The Lean Six Sigma Black Belt training helps the delegates to learn Lean concepts so that they are able to lead a team of professionals during project execution.

  • Using Lean Methodology, decrease Waste Processes and increase Productivity.

  • Lean Six Sigma Certification is not focused to just one particular industry.

  • Experienced and certified instructors to impart knowledge to the delegates during the course

  • Major industries recognize Lean Six Sigma Black Belt Certification

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

  • A Green Belt certification
  • Experience of a Green Belt project

TARGET AUDIENCE

  • Green Belt Certified Professionals
  • Project Managers

WHAT WILL YOU LEARN?

After the completion of the course, the delegates will get expertise of the following concepts:

  • Project planning.
  • Determining and managing requirements of stakeholders.
  • How to improve various tools used for gauging and analysing business processes.
  • To determine a customer’s value make use of Lean concepts
  • The delegates learn to implement perfection by the use of low develop pull system.
  • Analyse, Quantify and Choose the best available solutions
  • Understand Process Change
  • Control Business Processes
  • Manage Green Belt Projects

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The concept of Lean aims at removing the waste processes due to which the project tends to divert away from its scope. Six Sigma, on the other hand, reduces processes variations and couples the processes together more tightly.

In the line of Lean Six Sigma, Lean Six Sigma Black Belt is the one that excels among all. Anybody interested in going through this course must be familiar with the concepts of Lean Six Sigma Green Belt. A Lean Six Sigma Black Belt certified professional leads a team of professionals who are already certified as Green Belt professionals.

IASSC (International Association for Six Sigma Certification™), the only third-party certification authority for Lean Six Sigma, certifies the delegates after passing an examination.

Exam

Exam Type: Closed Book Proctored Exam

Duration: 240 minutes

Questions: 150 Multiple Choice Questions

 


PROGRAM CONTENT

    • Define Phase
      • The Basics of Six Sigma
        • Meanings of Six Sigma
        • General History of Six Sigma & Continuous Improvement
        • What Does A Lean Six Sigma Project Deliver
        • The Problem Solving Strategy Y = f(x)
        • Voice of the Customer, Business and Employee
        • Six Sigma Roles & Responsibilities
      • The Fundamentals of Six Sigma
        • Defining a Process
        • Serious Quality Characteristics (CTQ’s)
        • Poor Quality Cost
        • The Pareto Analysis (80:20 rule)
        • Six Sigma - Measurement Standards
      • Selecting Lean Six Sigma Projects
        • Building a Business Case & Project Charter
        • Developing Project Metrics
        • Financial Evaluation & Benefits Capture
      • Undestanding The Lean Enterprise
        • Lean – An Understanding and its History
        • The Combination of Lean & Six Sigma
        • The Seven Waste Elements
        • 5S
          • Define Straighten, Shine, Standardize, Self-Discipline, Sort

     

    • Measure Phase
      • Process Definition
        • Cause & Effect / Fishbone Diagrams
        • Process Mapping, SIPOC, Value Stream Map
        • X-Y Diagram
        • Failure Modes & Effects Analysis (FMEA)
      • Six Sigma Statistics
        • Basic Statistics
        • Descriptive Statistics
        • Normal Distributions & Normality
        • Graphical Analysis
      • Measurement System Analysis
        • Precision & Accuracy
        • Bias, Linearity & Stability
        • Gage Repeatability & Reproducibility
        • Variable & Attribute MSA
      • Process Capability
        • Capability Analysis
        • Concept of Stability
        • Attribute & Discrete Capability
        • Monitoring Techniques
      • Analyze Phase
        • Patterns of Variation
          • Multi-Vari Analysis
          • Classes of Distributions
        • Inferential Statistics
          • Understanding Inference
          • Sampling Techniques & Uses
          • Central Limit Theorem
        • Hypothesis Testing
          • General Concepts & Goals of Hypothesis Testing
          • Significance; Practical vs. Statistical
          • Risk; Alpha & Beta
          • Types of Hypothesis Test
        • Hypothesis Testing with Normal Data
          • 1 & 2 sample t-tests
          • 1 sample variance
          • One Way ANOVA
        • Hypothesis Testing with Non-Normal Data
          • Mann-Whitney
          • Kruskal-Wallis
          • Mood’s Median
          • Friedman
          • 1 Sample Sign
          • 1 Sample Wilcoxon
          • One and Two Sample Proportion
          • Chi-Squared (Contingency Tables)
        • Improve Phase
          • Simple Linear Regression
            • Correlation
            • Regression Equations
            • Residuals Analysis
          • Multiple Regression Analysis
            • Non- Linear Regression
            • Multiple Linear Regression
            • Confidence & Prediction Intervals
            • Residuals Analysis
            • Data Transformation, Box Cox
          • Designed Experiments
            • Experiment Objectives
            • Experimental Methods
            • Experiment Design Considerations
          • Full Factorial Experiments
            • 2k Full Factorial Designs
            • Linear & Quadratic Mathematical Models
            • Balanced & Orthogonal Designs
            • Fit, Diagnose Model and Center Points
          • Fractional Factorial Experiments
            • Designs
            • Confounding Effects
            • Experimental Resolution
          • Control Phase
            • Lean Controls
              • Control Methods for 5S
              • Kanban
              • Poka-Yoke (Mistake Proofing)
            • Statistical Process Control (SPC)
              • Data Collection for SPC
              • I-MR Chart
              • Xbar-R Chart
              • U Chart
              • P Chart
              • NP Chart
              • Xbar-S Chart
              • CumSum Chart
              • EWMA Chart
              • Control Methods
              • Control Chart Anatomy
              • Subgroups, Impact of Variation, Frequency of Sampling
              • Center Line & Control Limit Calculations
            • Six Sigma Control Plans
              • Cost Benefit Analysis
              • Elements of the Control Plan
    Elements of the Response Plan

Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Corby

Corby is a borough which is located 37 km away from the north-east of Northampton. It is the town with fastest growing population in Northamptonshire as well as England. The census held in 2011 reports that Corby had a population of sixty-one thousand three hundred. It is located 37 km away from the north-east of Northampton. Due to a large number of Scottish migrant workers who came to Corby for its steelworks, Corby was at one time known locally as "Little Scotland". The town was a small village until 1930. All the changes took place with the opening of the steelworks by Stewarts and Lloyds. It is a rapidly changing place and a vibrant.

Politics:

Created since 1983, the constituency of Corby contains parts of traditionally Conservative East Northamptonshire. Corby has since 2005 won almos every election. Labour won the General Elections in 2005 by a huge majority. However it was in 2010 that the Labour Party candidate lost the seat to the Conservatives. In 2012 again, the Labour Party came to power when Mensch resigned as an MP The seat was won by Labour's Andy Sawford. As the constituency was an important seat, it attracted both national and international media.The Corby Borough Council , since 1979, has been under the control of the Labour party in local politics. During the 2015 elections ,Corby was represented by 5 Conservatives and 24 Labour Party members.

Employment and Education

Employment in Corby is against health and education, public administration and biased towards manufacturing. Weetos are made in the north of the town by Weetabix Limited. The town also is home to workshops that manufacture Fairline Boats. Amy’s Kitchen opened a factory in Corby a short time back. The Census of 2001 depicted the ratio of the working-age population to its degree-level qualifications at its lowest in both England and Wales. A 39.3% of the total population are without any GCSE-equivalent qualification. Corby had a population of 61,255 according to 2011 census. There are85.0% White British, 9.1% Other White, 85.0% White British, 9.1% Other White. Oakley Vale is Corby's least White British with only 70.7% of the population being White British. A range of vocational courses is provided to post-16 students and adult learners by the Corby campus of Tresham Institute of Further and Higher Education. The nearest universities to the south are the University of Northampton and to the west are De Montfort University in Leicester and University of Leicester.

Society and Culture

According to 2001 census, the number children of Scottish-origin in the Corby Urban Area was 10, 063 around 18.9% of the total population. A large number of the inhabitants of Corby enjoy this Scottish heritage. Apart from London, Corby is the only town in England with two Church of Scotland churches. About the town of the Corpy, a song Steeltown by Big Country was written.

Sport and Leisure

The main football team in Corby who play in the National League North is the Corby Town F.C. Corby is also home to the Corby East Midlands International Swimming Pool that came up in 2009. The Stewarts and Lloyds Rugby Football Club plays its home games in Corby. The club also has an athletic club for youngsters below 11 ears of age and also for those who have crossed 60. When the Youth Development League took place, the upper age group was promoted to Midland East 1 and it also gained a promotion in the Heart of England Athletics League.

Climate

Corby experiences a maritime climate mild winters and with cool summers. In Corby, the highest recorded temperature was 35 °C (95.0 °F) in August 1990 and the lowest was recorded during 1987 which was −23.3 °C (−9.9 °F).

Lean Six Sigma

What is Le...