Lean Six Sigma Black Belt

Increasing Organisational Profits with Lean Six Sigma

ABOUT THE PROGRAM

As of now the concept of “Customer is King” is held in high esteem by all organisations. To please the customer, the focus is on reducing delivery time. As they say “Time Saved is Money Saved”. Lean Six Sigma is an approach that removes any extra unwanted processes, saves resources and time and makes the entire process streamlined. Lean Six Sigma optimizes organisational processes to increase productivity.

At MSP Training, we ensure the delegates get trained in the concepts of Lean Six Sigma and they are able to cope up with the problems they face in real-time situations at their organisation. The Lean Six Sigma Black Belt training helps the delegates to learn Lean concepts so that they are able to lead a team of professionals during project execution.

  • Using Lean Methodology, decrease Waste Processes and increase Productivity.

  • Lean Six Sigma Certification is not focused to just one particular industry.

  • Experienced and certified instructors to impart knowledge to the delegates during the course

  • Major industries recognize Lean Six Sigma Black Belt Certification

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

  • A Green Belt certification
  • Experience of a Green Belt project

TARGET AUDIENCE

  • Green Belt Certified Professionals
  • Project Managers

WHAT WILL YOU LEARN?

After the completion of the course, the delegates will get expertise of the following concepts:

  • Project planning.
  • Determining and managing requirements of stakeholders.
  • How to improve various tools used for gauging and analysing business processes.
  • To determine a customer’s value make use of Lean concepts
  • The delegates learn to implement perfection by the use of low develop pull system.
  • Analyse, Quantify and Choose the best available solutions
  • Understand Process Change
  • Control Business Processes
  • Manage Green Belt Projects

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The concept of Lean aims at removing the waste processes due to which the project tends to divert away from its scope. Six Sigma, on the other hand, reduces processes variations and couples the processes together more tightly.

In the line of Lean Six Sigma, Lean Six Sigma Black Belt is the one that excels among all. Anybody interested in going through this course must be familiar with the concepts of Lean Six Sigma Green Belt. A Lean Six Sigma Black Belt certified professional leads a team of professionals who are already certified as Green Belt professionals.

IASSC (International Association for Six Sigma Certification™), the only third-party certification authority for Lean Six Sigma, certifies the delegates after passing an examination.

Exam

Exam Type: Closed Book Proctored Exam

Duration: 240 minutes

Questions: 150 Multiple Choice Questions

 


PROGRAM CONTENT

    • Define Phase
      • The Basics of Six Sigma
        • Meanings of Six Sigma
        • General History of Six Sigma & Continuous Improvement
        • What Does A Lean Six Sigma Project Deliver
        • The Problem Solving Strategy Y = f(x)
        • Voice of the Customer, Business and Employee
        • Six Sigma Roles & Responsibilities
      • The Fundamentals of Six Sigma
        • Defining a Process
        • Serious Quality Characteristics (CTQ’s)
        • Poor Quality Cost
        • The Pareto Analysis (80:20 rule)
        • Six Sigma - Measurement Standards
      • Selecting Lean Six Sigma Projects
        • Building a Business Case & Project Charter
        • Developing Project Metrics
        • Financial Evaluation & Benefits Capture
      • Undestanding The Lean Enterprise
        • Lean – An Understanding and its History
        • The Combination of Lean & Six Sigma
        • The Seven Waste Elements
        • 5S
          • Define Straighten, Shine, Standardize, Self-Discipline, Sort

     

    • Measure Phase
      • Process Definition
        • Cause & Effect / Fishbone Diagrams
        • Process Mapping, SIPOC, Value Stream Map
        • X-Y Diagram
        • Failure Modes & Effects Analysis (FMEA)
      • Six Sigma Statistics
        • Basic Statistics
        • Descriptive Statistics
        • Normal Distributions & Normality
        • Graphical Analysis
      • Measurement System Analysis
        • Precision & Accuracy
        • Bias, Linearity & Stability
        • Gage Repeatability & Reproducibility
        • Variable & Attribute MSA
      • Process Capability
        • Capability Analysis
        • Concept of Stability
        • Attribute & Discrete Capability
        • Monitoring Techniques
      • Analyze Phase
        • Patterns of Variation
          • Multi-Vari Analysis
          • Classes of Distributions
        • Inferential Statistics
          • Understanding Inference
          • Sampling Techniques & Uses
          • Central Limit Theorem
        • Hypothesis Testing
          • General Concepts & Goals of Hypothesis Testing
          • Significance; Practical vs. Statistical
          • Risk; Alpha & Beta
          • Types of Hypothesis Test
        • Hypothesis Testing with Normal Data
          • 1 & 2 sample t-tests
          • 1 sample variance
          • One Way ANOVA
        • Hypothesis Testing with Non-Normal Data
          • Mann-Whitney
          • Kruskal-Wallis
          • Mood’s Median
          • Friedman
          • 1 Sample Sign
          • 1 Sample Wilcoxon
          • One and Two Sample Proportion
          • Chi-Squared (Contingency Tables)
        • Improve Phase
          • Simple Linear Regression
            • Correlation
            • Regression Equations
            • Residuals Analysis
          • Multiple Regression Analysis
            • Non- Linear Regression
            • Multiple Linear Regression
            • Confidence & Prediction Intervals
            • Residuals Analysis
            • Data Transformation, Box Cox
          • Designed Experiments
            • Experiment Objectives
            • Experimental Methods
            • Experiment Design Considerations
          • Full Factorial Experiments
            • 2k Full Factorial Designs
            • Linear & Quadratic Mathematical Models
            • Balanced & Orthogonal Designs
            • Fit, Diagnose Model and Center Points
          • Fractional Factorial Experiments
            • Designs
            • Confounding Effects
            • Experimental Resolution
          • Control Phase
            • Lean Controls
              • Control Methods for 5S
              • Kanban
              • Poka-Yoke (Mistake Proofing)
            • Statistical Process Control (SPC)
              • Data Collection for SPC
              • I-MR Chart
              • Xbar-R Chart
              • U Chart
              • P Chart
              • NP Chart
              • Xbar-S Chart
              • CumSum Chart
              • EWMA Chart
              • Control Methods
              • Control Chart Anatomy
              • Subgroups, Impact of Variation, Frequency of Sampling
              • Center Line & Control Limit Calculations
            • Six Sigma Control Plans
              • Cost Benefit Analysis
              • Elements of the Control Plan
    Elements of the Response Plan

Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Hinckley

Hinckley, in southwest Leicestershire between the cities of Leicester and Coventry,  is the second biggest town in terms of area. Hinckley is administered by the council of Hinckley and Bosworth Borough.

 Places

  • The Battle of Bosworth: The site of the Battle of Bosworth is located in Hinckley. The site houses an interpretation centre at Ambion Hill, where King Richard III set up camp before proceeding further for battle. Many soldiers who died during the battle are buried at St James's Church in Dadlington. The place is now a shrine for the ones who lost their lives.
  • Hinckley Museum: The Museum is home to 17th-century knitter’s cottages made from timber.
  • Stoke Golding: The site is home to a very fine arcade that can be found in some of the most beautiful medieval period churches.
  • St Mary's Church: It is a 13th-century church dedicated to Virgin Mary and located in the centre of Hinckley. Richard Smith was a young horse rider who was murdered in 1727. A tombstone dedicated to the youth is present in the courtyard. Every year on 12th April, this tombstone bleeds. April 12 is the date when the youth was murdered. The church remains open daily from 10.00 to 4.00 pm, and during the services on Sunday.
  • Parks Hollycroft Park: The park actually belonged to the Atkins family but in 1934 the Atkins handed over the park to the city authorities so it could be opened to the public. The park is very much liked by those who wish to play tennis and golf. The park houses various tennis courts, a bowling green, gardens, golf course and a bandstand. Many big events in the town take place at this park. The park in the years 2010 to 2012 received the Green Flag Status for achieving high standards.

 Other places that could attract visitors are the Brodick Park in the west of Hinckley and the Ashby Canal. The park with all its trees acts as a nature reserve. On the other hand, the canal is the longest curved canal in England passing through Hinckley.

Transport

The Hinckley town is equally placed at a distance of 19 km from both Coventry and Leicester. The town of Ibstock lies 18 km to the north on the A447 motorway.

Roads

It was in the early 1990’s that the A47 was by-passed as a result of the completion of the Normandy Way. This not only decreased congestion in the town, it was also helpful in the commercial development of the town along the A47 route. Hinckley has two motorways the A5 and the M69 with the M69 linking Hinkley to Leicester, Coventry and the two motorways the M6 and the M1.

 Bus

The main operators of the bus services in Hinckley are the Hinckley Bus. The service has routes for Barwell, Burbage, Earl Shilton, Leicester and Nuneaton. Up until 2008, a number of services were operated for rural areas by  Arriva. This stopped when Arriva was sold to Centrebus Holdings. Arriva regained the stake from Centrebus Holdings in 2013. Other major bus service operators in Hinckley include Stagecoach and Arriva Fox County.

Railway

The Hinckley railway station lies on the Birmingham to Peterborough Line on the Nuneaton–Leicester section.There are regular services being operated via Narborough and Nuneaton between Birmingham and Leicester. Residents can journey to London via the West Coast Main Line or through Midland Main Line. The Midland route terminus is the London St Pancras which ever since November 2007 has been the home of Eurostar international services.

Airports

The airports that fall the nearest to Hinckley are the Birmingham International and the East Midlands.

Lean Six Sigma

What is Le...