Lean Six Sigma Black Belt

Increasing Organisational Profits with Lean Six Sigma

ABOUT THE PROGRAM

As of now the concept of “Customer is King” is held in high esteem by all organisations. To please the customer, the focus is on reducing delivery time. As they say “Time Saved is Money Saved”. Lean Six Sigma is an approach that removes any extra unwanted processes, saves resources and time and makes the entire process streamlined. Lean Six Sigma optimizes organisational processes to increase productivity.

At MSP Training, we ensure the delegates get trained in the concepts of Lean Six Sigma and they are able to cope up with the problems they face in real-time situations at their organisation. The Lean Six Sigma Black Belt training helps the delegates to learn Lean concepts so that they are able to lead a team of professionals during project execution.

  • Using Lean Methodology, decrease Waste Processes and increase Productivity.

  • Lean Six Sigma Certification is not focused to just one particular industry.

  • Experienced and certified instructors to impart knowledge to the delegates during the course

  • Major industries recognize Lean Six Sigma Black Belt Certification

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

  • A Green Belt certification
  • Experience of a Green Belt project

TARGET AUDIENCE

  • Green Belt Certified Professionals
  • Project Managers

WHAT WILL YOU LEARN?

After the completion of the course, the delegates will get expertise of the following concepts:

  • Project planning.
  • Determining and managing requirements of stakeholders.
  • How to improve various tools used for gauging and analysing business processes.
  • To determine a customer’s value make use of Lean concepts
  • The delegates learn to implement perfection by the use of low develop pull system.
  • Analyse, Quantify and Choose the best available solutions
  • Understand Process Change
  • Control Business Processes
  • Manage Green Belt Projects

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The concept of Lean aims at removing the waste processes due to which the project tends to divert away from its scope. Six Sigma, on the other hand, reduces processes variations and couples the processes together more tightly.

In the line of Lean Six Sigma, Lean Six Sigma Black Belt is the one that excels among all. Anybody interested in going through this course must be familiar with the concepts of Lean Six Sigma Green Belt. A Lean Six Sigma Black Belt certified professional leads a team of professionals who are already certified as Green Belt professionals.

IASSC (International Association for Six Sigma Certification™), the only third-party certification authority for Lean Six Sigma, certifies the delegates after passing an examination.

Exam

Exam Type: Closed Book Proctored Exam

Duration: 240 minutes

Questions: 150 Multiple Choice Questions

 


PROGRAM CONTENT

    • Define Phase
      • The Basics of Six Sigma
        • Meanings of Six Sigma
        • General History of Six Sigma & Continuous Improvement
        • What Does A Lean Six Sigma Project Deliver
        • The Problem Solving Strategy Y = f(x)
        • Voice of the Customer, Business and Employee
        • Six Sigma Roles & Responsibilities
      • The Fundamentals of Six Sigma
        • Defining a Process
        • Serious Quality Characteristics (CTQ’s)
        • Poor Quality Cost
        • The Pareto Analysis (80:20 rule)
        • Six Sigma - Measurement Standards
      • Selecting Lean Six Sigma Projects
        • Building a Business Case & Project Charter
        • Developing Project Metrics
        • Financial Evaluation & Benefits Capture
      • Undestanding The Lean Enterprise
        • Lean – An Understanding and its History
        • The Combination of Lean & Six Sigma
        • The Seven Waste Elements
        • 5S
          • Define Straighten, Shine, Standardize, Self-Discipline, Sort

     

    • Measure Phase
      • Process Definition
        • Cause & Effect / Fishbone Diagrams
        • Process Mapping, SIPOC, Value Stream Map
        • X-Y Diagram
        • Failure Modes & Effects Analysis (FMEA)
      • Six Sigma Statistics
        • Basic Statistics
        • Descriptive Statistics
        • Normal Distributions & Normality
        • Graphical Analysis
      • Measurement System Analysis
        • Precision & Accuracy
        • Bias, Linearity & Stability
        • Gage Repeatability & Reproducibility
        • Variable & Attribute MSA
      • Process Capability
        • Capability Analysis
        • Concept of Stability
        • Attribute & Discrete Capability
        • Monitoring Techniques
      • Analyze Phase
        • Patterns of Variation
          • Multi-Vari Analysis
          • Classes of Distributions
        • Inferential Statistics
          • Understanding Inference
          • Sampling Techniques & Uses
          • Central Limit Theorem
        • Hypothesis Testing
          • General Concepts & Goals of Hypothesis Testing
          • Significance; Practical vs. Statistical
          • Risk; Alpha & Beta
          • Types of Hypothesis Test
        • Hypothesis Testing with Normal Data
          • 1 & 2 sample t-tests
          • 1 sample variance
          • One Way ANOVA
        • Hypothesis Testing with Non-Normal Data
          • Mann-Whitney
          • Kruskal-Wallis
          • Mood’s Median
          • Friedman
          • 1 Sample Sign
          • 1 Sample Wilcoxon
          • One and Two Sample Proportion
          • Chi-Squared (Contingency Tables)
        • Improve Phase
          • Simple Linear Regression
            • Correlation
            • Regression Equations
            • Residuals Analysis
          • Multiple Regression Analysis
            • Non- Linear Regression
            • Multiple Linear Regression
            • Confidence & Prediction Intervals
            • Residuals Analysis
            • Data Transformation, Box Cox
          • Designed Experiments
            • Experiment Objectives
            • Experimental Methods
            • Experiment Design Considerations
          • Full Factorial Experiments
            • 2k Full Factorial Designs
            • Linear & Quadratic Mathematical Models
            • Balanced & Orthogonal Designs
            • Fit, Diagnose Model and Center Points
          • Fractional Factorial Experiments
            • Designs
            • Confounding Effects
            • Experimental Resolution
          • Control Phase
            • Lean Controls
              • Control Methods for 5S
              • Kanban
              • Poka-Yoke (Mistake Proofing)
            • Statistical Process Control (SPC)
              • Data Collection for SPC
              • I-MR Chart
              • Xbar-R Chart
              • U Chart
              • P Chart
              • NP Chart
              • Xbar-S Chart
              • CumSum Chart
              • EWMA Chart
              • Control Methods
              • Control Chart Anatomy
              • Subgroups, Impact of Variation, Frequency of Sampling
              • Center Line & Control Limit Calculations
            • Six Sigma Control Plans
              • Cost Benefit Analysis
              • Elements of the Control Plan
    Elements of the Response Plan

Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Lincoln

Lincoln which is situated in Lincolnshire, is a cathedral city and as per 2011 census had a population of 94,600. In the early periods, it was known as Lindum Colonia, a Roman colony. Lindum Colonia had come up from a settlement of the Iron Age that belonged to the 1st Century B.C. The settlement was the result of a deep pool and the name also probably comes from the word Lindon which was later converted to the Latin form Lindum. The full name for the location was  Colonia Domitiana Lindensium, which went by its founder, Domitian’s name. The colony was established within the walls of the hilltop fortress, to which an extension was also added later on, of an equal area.

Cathedral

First of all the construction of the Lincoln Cathedral began with the see being removed from the backwater of Dorchester-on-Thames, Oxfordshire. It was completed in 1092 but had to be rebuilt after a fire destroyed it. The cause of the fire is said to have been an earthquake that shook Lincoln in 1185. When the Lincoln Minster was rebuilt it had an added portion to the east.  The construction was completed on a superb scale with the crossing tower decorated by a pinnacle that rose to 525 ft, and considered to be the highest Europe has ever had till date. After the completion of all the three spires, the central spire is expected to be the tallest man-made structure in the world after the Great Pyramids of Egypt.

The Bishops of Lincoln were said to be one of the richest people in medieval England. The Diocese of Lincoln, considered to be the biggest in England, was home to more monasteries than the entire English counties put together.

When Magna Carta, the charter to bring peace between the king and rebel barons, was signed, one of the witnesses happened to be the Bishop of Lincoln, Hugh of Wells. There is only one copy that remains of the four originals and that is in the Lincoln Castle.

Lincoln Cathedral

The bishops of Lincoln who were most known were :

  • Robert Bloet
  • Hugh of Avalon
  • Robert Grosseteste
  • Henry Beaufort
  • Thomas Wolsey
  • Philip Repyngdon
  • Thomas Rotherham

Theologian William de Montibus was the chancellor and head of the cathedral school till his death in 1213. The Bishop’s Palace was the centre of administration. Built towards the end of the 12th Century, it was a magnificent building of that era in England. The East Hall of the Palace, designed by Hugh of Lincoln, is the earliest enduring example of a roofed domestic hall. Bishop William of Alnwick was responsible for building the other two parts namely the chapel range and entrance tower. It was he who also improvised upon the existing structure and lend a modern look to it in the 1430s. King Henry VIII and James I are said to have been e guests of the bishops at Lincoln Cathedral. Some royal troops ransacked the cathedral in 1648 during the civil war. The cathedral had another recent break-in due to which the stained glass had to be replaced.

 Notable people

  • Penelope Fitzgerald, born in 1916 was a novelist and biographer
  • George Boole, born in Lincoln in 1815 and developed the Boolean Algebra
  • Sir Francis Hill, mayor of Lincoln was born in Lincoln in 1899.
  • William Byrd, organist and composer
  • Neville Marriner (1924–2016).
  • Sam Clucas, a Hull City footballer was born in Lincoln in 1990.
  • Steve Race, broadcaster, was born in Lincoln

Famous Attractions

  • Jew’s House
  • Jew’s Court
  • Lincoln Castle
  • Lincoln Cathedral
  • Steep Hill
  • Viking Way

Lean Six Sigma

What is Le...