Lean Six Sigma Black Belt

Increasing Organisational Profits with Lean Six Sigma

ABOUT THE PROGRAM

As of now the concept of “Customer is King” is held in high esteem by all organisations. To please the customer, the focus is on reducing delivery time. As they say “Time Saved is Money Saved”. Lean Six Sigma is an approach that removes any extra unwanted processes, saves resources and time and makes the entire process streamlined. Lean Six Sigma optimizes organisational processes to increase productivity.

At MSP Training, we ensure the delegates get trained in the concepts of Lean Six Sigma and they are able to cope up with the problems they face in real-time situations at their organisation. The Lean Six Sigma Black Belt training helps the delegates to learn Lean concepts so that they are able to lead a team of professionals during project execution.

  • Using Lean Methodology, decrease Waste Processes and increase Productivity.

  • Lean Six Sigma Certification is not focused to just one particular industry.

  • Experienced and certified instructors to impart knowledge to the delegates during the course

  • Major industries recognize Lean Six Sigma Black Belt Certification

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

  • A Green Belt certification
  • Experience of a Green Belt project

TARGET AUDIENCE

  • Green Belt Certified Professionals
  • Project Managers

WHAT WILL YOU LEARN?

After the completion of the course, the delegates will get expertise of the following concepts:

  • Project planning.
  • Determining and managing requirements of stakeholders.
  • How to improve various tools used for gauging and analysing business processes.
  • To determine a customer’s value make use of Lean concepts
  • The delegates learn to implement perfection by the use of low develop pull system.
  • Analyse, Quantify and Choose the best available solutions
  • Understand Process Change
  • Control Business Processes
  • Manage Green Belt Projects

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The concept of Lean aims at removing the waste processes due to which the project tends to divert away from its scope. Six Sigma, on the other hand, reduces processes variations and couples the processes together more tightly.

In the line of Lean Six Sigma, Lean Six Sigma Black Belt is the one that excels among all. Anybody interested in going through this course must be familiar with the concepts of Lean Six Sigma Green Belt. A Lean Six Sigma Black Belt certified professional leads a team of professionals who are already certified as Green Belt professionals.

IASSC (International Association for Six Sigma Certification™), the only third-party certification authority for Lean Six Sigma, certifies the delegates after passing an examination.

Exam

Exam Type: Closed Book Proctored Exam

Duration: 240 minutes

Questions: 150 Multiple Choice Questions

 


PROGRAM CONTENT

    • Define Phase
      • The Basics of Six Sigma
        • Meanings of Six Sigma
        • General History of Six Sigma & Continuous Improvement
        • What Does A Lean Six Sigma Project Deliver
        • The Problem Solving Strategy Y = f(x)
        • Voice of the Customer, Business and Employee
        • Six Sigma Roles & Responsibilities
      • The Fundamentals of Six Sigma
        • Defining a Process
        • Serious Quality Characteristics (CTQ’s)
        • Poor Quality Cost
        • The Pareto Analysis (80:20 rule)
        • Six Sigma - Measurement Standards
      • Selecting Lean Six Sigma Projects
        • Building a Business Case & Project Charter
        • Developing Project Metrics
        • Financial Evaluation & Benefits Capture
      • Undestanding The Lean Enterprise
        • Lean – An Understanding and its History
        • The Combination of Lean & Six Sigma
        • The Seven Waste Elements
        • 5S
          • Define Straighten, Shine, Standardize, Self-Discipline, Sort

     

    • Measure Phase
      • Process Definition
        • Cause & Effect / Fishbone Diagrams
        • Process Mapping, SIPOC, Value Stream Map
        • X-Y Diagram
        • Failure Modes & Effects Analysis (FMEA)
      • Six Sigma Statistics
        • Basic Statistics
        • Descriptive Statistics
        • Normal Distributions & Normality
        • Graphical Analysis
      • Measurement System Analysis
        • Precision & Accuracy
        • Bias, Linearity & Stability
        • Gage Repeatability & Reproducibility
        • Variable & Attribute MSA
      • Process Capability
        • Capability Analysis
        • Concept of Stability
        • Attribute & Discrete Capability
        • Monitoring Techniques
      • Analyze Phase
        • Patterns of Variation
          • Multi-Vari Analysis
          • Classes of Distributions
        • Inferential Statistics
          • Understanding Inference
          • Sampling Techniques & Uses
          • Central Limit Theorem
        • Hypothesis Testing
          • General Concepts & Goals of Hypothesis Testing
          • Significance; Practical vs. Statistical
          • Risk; Alpha & Beta
          • Types of Hypothesis Test
        • Hypothesis Testing with Normal Data
          • 1 & 2 sample t-tests
          • 1 sample variance
          • One Way ANOVA
        • Hypothesis Testing with Non-Normal Data
          • Mann-Whitney
          • Kruskal-Wallis
          • Mood’s Median
          • Friedman
          • 1 Sample Sign
          • 1 Sample Wilcoxon
          • One and Two Sample Proportion
          • Chi-Squared (Contingency Tables)
        • Improve Phase
          • Simple Linear Regression
            • Correlation
            • Regression Equations
            • Residuals Analysis
          • Multiple Regression Analysis
            • Non- Linear Regression
            • Multiple Linear Regression
            • Confidence & Prediction Intervals
            • Residuals Analysis
            • Data Transformation, Box Cox
          • Designed Experiments
            • Experiment Objectives
            • Experimental Methods
            • Experiment Design Considerations
          • Full Factorial Experiments
            • 2k Full Factorial Designs
            • Linear & Quadratic Mathematical Models
            • Balanced & Orthogonal Designs
            • Fit, Diagnose Model and Center Points
          • Fractional Factorial Experiments
            • Designs
            • Confounding Effects
            • Experimental Resolution
          • Control Phase
            • Lean Controls
              • Control Methods for 5S
              • Kanban
              • Poka-Yoke (Mistake Proofing)
            • Statistical Process Control (SPC)
              • Data Collection for SPC
              • I-MR Chart
              • Xbar-R Chart
              • U Chart
              • P Chart
              • NP Chart
              • Xbar-S Chart
              • CumSum Chart
              • EWMA Chart
              • Control Methods
              • Control Chart Anatomy
              • Subgroups, Impact of Variation, Frequency of Sampling
              • Center Line & Control Limit Calculations
            • Six Sigma Control Plans
              • Cost Benefit Analysis
              • Elements of the Control Plan
    Elements of the Response Plan

Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Poole

Poole is a large coastal town lies on the southern shore of England with a population of around 147,645 according to 2001 census. It is a seaport in the county of Dorset located about 33 kilometres east of Dorchester. In 1997, the town granted a unitary authority and Borough of Poole administers the local council. Poole along with the towns of Christchurch and Bournemouth, it forms the part of Poole-Bournemouth urban area or South Dorset conurbation. It is the second largest town in Dorset. The early history of the town found back before the Iron Age. The town developed as an important port in the 12th century, and the wealth of the town grew with the introduction of the wool trade. The town made strong trade links with the North America. It became one of the busiest ports in the United Kingdom in the 18th century.

During the Second World War, the town served as the main departing point for Normandy landings, also known as Operation Neptune where landing operations of the Allied invasion of Normandy took place on D-Day. The town is considered as an attractive tourist destination and famous for its large natural Harbour, Blue Flag beaches and the Lighthouse arts centre. With passenger ferry and English Channel freight services, the town became an important commercial port of the country. Poole is home to Royal National Lifeboat Institution (RNLI) and Royal Marines.

History

The name of the town is developed from the English word pool meaning a place near a creek or stream of water. It has been suggested that the area around the Poole has been occupied from the last 2500 years. The Romans took over the settlement of Iron Age during the invasion of Britain in the first century. The town became an essential part of the Kingdom of Wessex during the Anglo-Saxons period, inhabited Great Britain in the 5th century. The town was used as a fishing and Harbour base, where ships main stayed on their passage to the River Frome. The town was considered as an important Anglo-Saxon town of Wareham, English county of Dorset. In 876, the town faced two major large-scale raids by Vikings and Canute also used the port of the town to raid and pillage Wessex.

The importance of Wareham declined, and the town grew rapidly as a busy port after the Norman occupation of England.  The Great Charter of Elizabeth I granted a county corporate, and subsequently, the town got legal independence from Dorset. The Newfoundland fisheries and North American colonies established a successful commerce with the town in the 16th century. The town experienced the most prosperous period from the early 18th century till early 19th century. The prosperous phase brought new developments including the replacement of medieval buildings with the terraced housing and Georgian mansions. The end of the Napoleonic Wars ended the Newfoundland trade, and most merchants ceased trading. During the industrialisation, the town grew rapidly and became a place for mercantile prosperity. The port of the town lost business as ships became too large for the shallow Harbour in the 19th century. The coastal shipping trade ended with the arrival of railways in 1847.

Economy

The economy of Poole is more balanced as compared to the rest towns of Dorset. The manufacturing sector flourished in 1960, whereas service sector including the relocation of the office-based employers expanded between the 1980 and 1990. The town is home to the world’s largest motor yachts builder Sunseeker and engaged more than 1800 workforce in the shipyards of the town. Other major employers in the town include Lush, Ryvita, Faerch Plast, Siemens and Kerry Foods. The economy of the town is based mainly on the service sector. Major employers in the service sector include Barclays Bank, Bank of New York Mellon, Arts University Bournemouth, Merlin Entertainments and American Express Bank.

Lean Six Sigma

What is Le...