Lean Six Sigma Black Belt

Increasing Organisational Profits with Lean Six Sigma

ABOUT THE PROGRAM

As of now the concept of “Customer is King” is held in high esteem by all organisations. To please the customer, the focus is on reducing delivery time. As they say “Time Saved is Money Saved”. Lean Six Sigma is an approach that removes any extra unwanted processes, saves resources and time and makes the entire process streamlined. Lean Six Sigma optimizes organisational processes to increase productivity.

At MSP Training, we ensure the delegates get trained in the concepts of Lean Six Sigma and they are able to cope up with the problems they face in real-time situations at their organisation. The Lean Six Sigma Black Belt training helps the delegates to learn Lean concepts so that they are able to lead a team of professionals during project execution.

  • Using Lean Methodology, decrease Waste Processes and increase Productivity.

  • Lean Six Sigma Certification is not focused to just one particular industry.

  • Experienced and certified instructors to impart knowledge to the delegates during the course

  • Major industries recognize Lean Six Sigma Black Belt Certification

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

  • A Green Belt certification
  • Experience of a Green Belt project

TARGET AUDIENCE

  • Green Belt Certified Professionals
  • Project Managers

WHAT WILL YOU LEARN?

After the completion of the course, the delegates will get expertise of the following concepts:

  • Project planning.
  • Determining and managing requirements of stakeholders.
  • How to improve various tools used for gauging and analysing business processes.
  • To determine a customer’s value make use of Lean concepts
  • The delegates learn to implement perfection by the use of low develop pull system.
  • Analyse, Quantify and Choose the best available solutions
  • Understand Process Change
  • Control Business Processes
  • Manage Green Belt Projects

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The concept of Lean aims at removing the waste processes due to which the project tends to divert away from its scope. Six Sigma, on the other hand, reduces processes variations and couples the processes together more tightly.

In the line of Lean Six Sigma, Lean Six Sigma Black Belt is the one that excels among all. Anybody interested in going through this course must be familiar with the concepts of Lean Six Sigma Green Belt. A Lean Six Sigma Black Belt certified professional leads a team of professionals who are already certified as Green Belt professionals.

IASSC (International Association for Six Sigma Certification™), the only third-party certification authority for Lean Six Sigma, certifies the delegates after passing an examination.

Exam

Exam Type: Closed Book Proctored Exam

Duration: 240 minutes

Questions: 150 Multiple Choice Questions

 


PROGRAM CONTENT

    • Define Phase
      • The Basics of Six Sigma
        • Meanings of Six Sigma
        • General History of Six Sigma & Continuous Improvement
        • What Does A Lean Six Sigma Project Deliver
        • The Problem Solving Strategy Y = f(x)
        • Voice of the Customer, Business and Employee
        • Six Sigma Roles & Responsibilities
      • The Fundamentals of Six Sigma
        • Defining a Process
        • Serious Quality Characteristics (CTQ’s)
        • Poor Quality Cost
        • The Pareto Analysis (80:20 rule)
        • Six Sigma - Measurement Standards
      • Selecting Lean Six Sigma Projects
        • Building a Business Case & Project Charter
        • Developing Project Metrics
        • Financial Evaluation & Benefits Capture
      • Undestanding The Lean Enterprise
        • Lean – An Understanding and its History
        • The Combination of Lean & Six Sigma
        • The Seven Waste Elements
        • 5S
          • Define Straighten, Shine, Standardize, Self-Discipline, Sort

     

    • Measure Phase
      • Process Definition
        • Cause & Effect / Fishbone Diagrams
        • Process Mapping, SIPOC, Value Stream Map
        • X-Y Diagram
        • Failure Modes & Effects Analysis (FMEA)
      • Six Sigma Statistics
        • Basic Statistics
        • Descriptive Statistics
        • Normal Distributions & Normality
        • Graphical Analysis
      • Measurement System Analysis
        • Precision & Accuracy
        • Bias, Linearity & Stability
        • Gage Repeatability & Reproducibility
        • Variable & Attribute MSA
      • Process Capability
        • Capability Analysis
        • Concept of Stability
        • Attribute & Discrete Capability
        • Monitoring Techniques
      • Analyze Phase
        • Patterns of Variation
          • Multi-Vari Analysis
          • Classes of Distributions
        • Inferential Statistics
          • Understanding Inference
          • Sampling Techniques & Uses
          • Central Limit Theorem
        • Hypothesis Testing
          • General Concepts & Goals of Hypothesis Testing
          • Significance; Practical vs. Statistical
          • Risk; Alpha & Beta
          • Types of Hypothesis Test
        • Hypothesis Testing with Normal Data
          • 1 & 2 sample t-tests
          • 1 sample variance
          • One Way ANOVA
        • Hypothesis Testing with Non-Normal Data
          • Mann-Whitney
          • Kruskal-Wallis
          • Mood’s Median
          • Friedman
          • 1 Sample Sign
          • 1 Sample Wilcoxon
          • One and Two Sample Proportion
          • Chi-Squared (Contingency Tables)
        • Improve Phase
          • Simple Linear Regression
            • Correlation
            • Regression Equations
            • Residuals Analysis
          • Multiple Regression Analysis
            • Non- Linear Regression
            • Multiple Linear Regression
            • Confidence & Prediction Intervals
            • Residuals Analysis
            • Data Transformation, Box Cox
          • Designed Experiments
            • Experiment Objectives
            • Experimental Methods
            • Experiment Design Considerations
          • Full Factorial Experiments
            • 2k Full Factorial Designs
            • Linear & Quadratic Mathematical Models
            • Balanced & Orthogonal Designs
            • Fit, Diagnose Model and Center Points
          • Fractional Factorial Experiments
            • Designs
            • Confounding Effects
            • Experimental Resolution
          • Control Phase
            • Lean Controls
              • Control Methods for 5S
              • Kanban
              • Poka-Yoke (Mistake Proofing)
            • Statistical Process Control (SPC)
              • Data Collection for SPC
              • I-MR Chart
              • Xbar-R Chart
              • U Chart
              • P Chart
              • NP Chart
              • Xbar-S Chart
              • CumSum Chart
              • EWMA Chart
              • Control Methods
              • Control Chart Anatomy
              • Subgroups, Impact of Variation, Frequency of Sampling
              • Center Line & Control Limit Calculations
            • Six Sigma Control Plans
              • Cost Benefit Analysis
              • Elements of the Control Plan
    Elements of the Response Plan

Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Tredegar

Tredegar, once a centre of Industrial Revolution in South Wales, is located on the banks of the Sirhowy River in Monmouthshire. One of the most famous ironworks in Richmond, Virginia, United States, The Tredegar Iron Works, was named after this town in England.

History

Samuel Homfray, who founded the town, needed residential places for their workers. Thus Tredegar was developed more as a need than for any other purpose. Lt.Col. Sir Charles Gould Morgan granted his land on the east side of the Sirhowy river, in 1799 for the building of the iron works company. As a means to develop business,  Homfray married Sir Charles’ daughter Jane and got an extension to the lease. However, The west bank remained undeveloped as it fell under the ownership of Lord Tredegar.

Those who wanted to run their businesses in Tredegar, Homfray sold franchisees to them But in return, he took a percentage from each of them. He also saw to it that his currency did not go to others. For this, he paid in his own currency that could be used only inside the town. In a few years, the parish grew and the mode of transport was fast becoming the horse carriages.

Governance – Facts

  • Aneurin Bevan who introduced the system of British National Health Service was born in Tredegar. Aneurin Bevan also used to manage the Tredegar General Hospital.
  • Neil Kinnock was born in 1942 in Tredegar. He later went on to become a member of the Labour Party from 1983 to 1992. For almost the whole of his early life, he lived in Tredegar.
  • Michael Foot, the precursor to Neil Kinnock, was MP for the local constituency, Ebbw Vale
  • Once considered to be a Labour Party seat, Tredegar was ruled for a few years by Dai Davies a left-wing independent until the general election of 2010 took place.

 Architecture:

There are two marvels of architecture that worth a see – the Town Clock and the Bedwellty House. The Bedwellty House is famous as it used to be the living place for the founder of Tredegar i.e. Samuel Homfray. A Victorian garden surrounds the house without any gates. The Long Shelter is also a part of the Bedwelity House.

The Town Clock stands in the southern part of the town. The clock was gifted by Mrs R.P. Davies, who was the wife of the manager of Tredegar Ironworks and, who also conceived the idea as well. JB Joyce & Co of Whitchurch, Shropshire were assigned to build this clock. Once this was done, the clock was erected in the Circle according to the instructions of Mrs.Davies.

Riots :

The town of Tredegar is known for three major riots that rocked the town. They occurred in 1868, 1882 and 1911. Each of these riots had a different purpose.

  • The 1868 riots took place as the local candidate who was Colonel Clifford, who was considered a favourite, was not elected.
  • In 1882 anti-Irish riots erupted in Tredegar. It is so sad that there had been tensions in Tredegar since 1850 regarding the presence of Irish people.different reports from the time tell varying stories but all report one thing as similar, the riots started with the pelting of stones and then spread to the destruction of Irish homes. The Irish were beaten and had to leave Tredegar for safety.To bring normalcy back, troops were summoned from Newport and Cardiff.
  • 1911 saw riots returning to Tredegar once again. This time they were anti-Jewish riots. These riots started a process called the pogrom (borrowed from the Nazi dictionary). The pogrom was meant to filter Jews and annihilate them according to the Nazi policies.  Jewish shops were burnt and their property ransacked but no deaths happened in Tredegar.

Lean Six Sigma

What is Le...