Lean Six Sigma Black Belt

Increasing Organisational Profits with Lean Six Sigma

ABOUT THE PROGRAM

As of now the concept of “Customer is King” is held in high esteem by all organisations. To please the customer, the focus is on reducing delivery time. As they say “Time Saved is Money Saved”. Lean Six Sigma is an approach that removes any extra unwanted processes, saves resources and time and makes the entire process streamlined. Lean Six Sigma optimizes organisational processes to increase productivity.

At MSP Training, we ensure the delegates get trained in the concepts of Lean Six Sigma and they are able to cope up with the problems they face in real-time situations at their organisation. The Lean Six Sigma Black Belt training helps the delegates to learn Lean concepts so that they are able to lead a team of professionals during project execution.

  • Using Lean Methodology, decrease Waste Processes and increase Productivity.

  • Lean Six Sigma Certification is not focused to just one particular industry.

  • Experienced and certified instructors to impart knowledge to the delegates during the course

  • Major industries recognize Lean Six Sigma Black Belt Certification

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

  • A Green Belt certification
  • Experience of a Green Belt project

TARGET AUDIENCE

  • Green Belt Certified Professionals
  • Project Managers

WHAT WILL YOU LEARN?

After the completion of the course, the delegates will get expertise of the following concepts:

  • Project planning.
  • Determining and managing requirements of stakeholders.
  • How to improve various tools used for gauging and analysing business processes.
  • To determine a customer’s value make use of Lean concepts
  • The delegates learn to implement perfection by the use of low develop pull system.
  • Analyse, Quantify and Choose the best available solutions
  • Understand Process Change
  • Control Business Processes
  • Manage Green Belt Projects

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The concept of Lean aims at removing the waste processes due to which the project tends to divert away from its scope. Six Sigma, on the other hand, reduces processes variations and couples the processes together more tightly.

In the line of Lean Six Sigma, Lean Six Sigma Black Belt is the one that excels among all. Anybody interested in going through this course must be familiar with the concepts of Lean Six Sigma Green Belt. A Lean Six Sigma Black Belt certified professional leads a team of professionals who are already certified as Green Belt professionals.

IASSC (International Association for Six Sigma Certification™), the only third-party certification authority for Lean Six Sigma, certifies the delegates after passing an examination.

Exam

Exam Type: Closed Book Proctored Exam

Duration: 240 minutes

Questions: 150 Multiple Choice Questions

 


PROGRAM CONTENT

    • Define Phase
      • The Basics of Six Sigma
        • Meanings of Six Sigma
        • General History of Six Sigma & Continuous Improvement
        • What Does A Lean Six Sigma Project Deliver
        • The Problem Solving Strategy Y = f(x)
        • Voice of the Customer, Business and Employee
        • Six Sigma Roles & Responsibilities
      • The Fundamentals of Six Sigma
        • Defining a Process
        • Serious Quality Characteristics (CTQ’s)
        • Poor Quality Cost
        • The Pareto Analysis (80:20 rule)
        • Six Sigma - Measurement Standards
      • Selecting Lean Six Sigma Projects
        • Building a Business Case & Project Charter
        • Developing Project Metrics
        • Financial Evaluation & Benefits Capture
      • Undestanding The Lean Enterprise
        • Lean – An Understanding and its History
        • The Combination of Lean & Six Sigma
        • The Seven Waste Elements
        • 5S
          • Define Straighten, Shine, Standardize, Self-Discipline, Sort

     

    • Measure Phase
      • Process Definition
        • Cause & Effect / Fishbone Diagrams
        • Process Mapping, SIPOC, Value Stream Map
        • X-Y Diagram
        • Failure Modes & Effects Analysis (FMEA)
      • Six Sigma Statistics
        • Basic Statistics
        • Descriptive Statistics
        • Normal Distributions & Normality
        • Graphical Analysis
      • Measurement System Analysis
        • Precision & Accuracy
        • Bias, Linearity & Stability
        • Gage Repeatability & Reproducibility
        • Variable & Attribute MSA
      • Process Capability
        • Capability Analysis
        • Concept of Stability
        • Attribute & Discrete Capability
        • Monitoring Techniques
      • Analyze Phase
        • Patterns of Variation
          • Multi-Vari Analysis
          • Classes of Distributions
        • Inferential Statistics
          • Understanding Inference
          • Sampling Techniques & Uses
          • Central Limit Theorem
        • Hypothesis Testing
          • General Concepts & Goals of Hypothesis Testing
          • Significance; Practical vs. Statistical
          • Risk; Alpha & Beta
          • Types of Hypothesis Test
        • Hypothesis Testing with Normal Data
          • 1 & 2 sample t-tests
          • 1 sample variance
          • One Way ANOVA
        • Hypothesis Testing with Non-Normal Data
          • Mann-Whitney
          • Kruskal-Wallis
          • Mood’s Median
          • Friedman
          • 1 Sample Sign
          • 1 Sample Wilcoxon
          • One and Two Sample Proportion
          • Chi-Squared (Contingency Tables)
        • Improve Phase
          • Simple Linear Regression
            • Correlation
            • Regression Equations
            • Residuals Analysis
          • Multiple Regression Analysis
            • Non- Linear Regression
            • Multiple Linear Regression
            • Confidence & Prediction Intervals
            • Residuals Analysis
            • Data Transformation, Box Cox
          • Designed Experiments
            • Experiment Objectives
            • Experimental Methods
            • Experiment Design Considerations
          • Full Factorial Experiments
            • 2k Full Factorial Designs
            • Linear & Quadratic Mathematical Models
            • Balanced & Orthogonal Designs
            • Fit, Diagnose Model and Center Points
          • Fractional Factorial Experiments
            • Designs
            • Confounding Effects
            • Experimental Resolution
          • Control Phase
            • Lean Controls
              • Control Methods for 5S
              • Kanban
              • Poka-Yoke (Mistake Proofing)
            • Statistical Process Control (SPC)
              • Data Collection for SPC
              • I-MR Chart
              • Xbar-R Chart
              • U Chart
              • P Chart
              • NP Chart
              • Xbar-S Chart
              • CumSum Chart
              • EWMA Chart
              • Control Methods
              • Control Chart Anatomy
              • Subgroups, Impact of Variation, Frequency of Sampling
              • Center Line & Control Limit Calculations
            • Six Sigma Control Plans
              • Cost Benefit Analysis
              • Elements of the Control Plan
    Elements of the Response Plan

Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Warrington

Warrington is referred as unitary authority area in Cheshire with a population of around 208,800 recorded in 2016. It lies on the shore of the Mersey River. The town is referred as the largest town in the county of Cheshire, England. It is located between the towns of Manchester and Liverpool. The population of the town grew strongly since 1968, and it became a new town. The history of the area traced its root back to the Roman period. The Romans discovered the town at an important crossing place on the Mersey River, and the Saxons set up the new settlement of the town. Warrington developed as a market town at the lowest bridging point, a place which is crossed by a bridge at its closest point to the sea during the Medieval Period. The town was engaged in the business of textile and wool production in the middle ages.

The town experienced the urbanisation and expansion after the industrialisation took place in historical counties of England and when Mersey was made traversable in the 18th century. The vital railway corridors in the United Kingdom, West Coast Main Line, runs north to south and the Cheshire Lines connecting the towns of Liverpool and Manchester, runs west to east. The Manchester Ship Canal, 36 miles long inland waterway connecting Manchester to the Irish Sea cuts through the south of the town from west to east. The partial box is created around the town with M6 and M62 motorways. In 1974, with the combination of former County Borough of Warrington, the Lymm Urban District and the Warrington Rural District, the modern borough of Warrington was developed.

History

The early settlement of the town was established at Wilderspool during the Roman Empire. The evidence of Bronze Age settlements had been suggested by the local archaeologists. The town developed at an important crossing point on the Mersey River since the ancient times. The importance of the town grew and emerged as a market town and crossing point of the Mersey River. The early reference to the bridge was first found in 1285. The area around the St Elphin’s church, now covered under the Church Street Conservation Area represent the origin of the modern town.The town played a crucial role in the English Civil War. The old town centre served as a mainstay for the armies of the Earl of Derby and Oliver Cromwell. During the industrial revolution, the town evolved as a manufacturing town and became a centre of textiles, steel, tanning and chemical industries.

The town flourished and became more popular after the construction of canal and improvement in the navigational properties of the Mersey River. The town accepted the introduction of steam in the town and used as a source of power for its mills. The town served as a base for RAF Station Burtonwood and airfield for the largest US Army Air Force during the Second World War, The new town status granted to Warrington in 1968. With the decline of heavy industries between 1970 and 1980, the economy of the town shifted to the light industry and technology. The town was affected by the Provisional Irish Republican Army bomb attacks in the town centre and later on, a bomb attack on a gas storage plant in Warrington.    

Economy

Warrington is home to the Unilever and ESR Technology. The major employers of the town are Warrington Council and Warrington & Halton Hospitals NHS Foundation Trust. In 1974, the first shopping centre was opened and covered new bus station and a Debenhams store. During the modernisation of the town centre, Warrington experienced a boost in its customer trade. There are several other shopping malls and large indoor market in the town. Gulliver’s World theme park is located in the town and covers Lilliput Land and the Safari Kingdom.

Lean Six Sigma

What is Le...