Six Sigma Black Belt Upgrade

Upgrading Project Management Skills

ABOUT THE PROGRAM

Motorola in 1986 introduced a concept for removing defects from the processes in a production line or anywhere in the organisation. This concept came to be known as Six Sigma and was also adopted by giants such as General Electric. General Electric in 1998 stated that it had gained savings worth $350 million and this went up to $1 billion in the coming years. The word spread and Six Sigma became a standard everyone was looking forward to following. Six Sigma manages time and mitigates defects  The purpose of introducing this in the business processes  - 3.4 defects in a million processes allowed.  By providing projects on time and within the given budget, Six Sigma helps to retain the clients of the organisation. Six Sigma creates professionals who can implement the Six Sigma methodology in the organisation and benefit the organisation by doing so.

  • Become a master of Six Sigma technologies

  • Learn to use the advanced tools and techniques of Six Sigma

  • Lead Six Sigma Project Management Teams

  • Get certified from Global Training Providers

  • Upgrade yourself to the latest versions, tools, and techniques of Six Sigma Black Belt

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

PREREQUISITES

  • Each of the candidates appearing for the course must be a minimum of a Green Belt professional.
  • The delegates must also have some in-hand experience regarding the core concepts of Six Sigma

TARGET AUDIENCE

  • Senior Management
  • Management students
  • Team leaders
  • Software Professionals
  • Administration of the company who have been using Six Sigma
  • Project Managers
  • Quality Assurance Engineers Members of Software Quality Assurance team
  • Audit managers
  • Security professionals

WHAT WILL YOU LEARN?

  • Implementing concepts such as 5S, waste reduction, process mapping, value stream mapping and error removal
  • Know how to define the relationship between the inputs and outputs of the various processes
  • Manage the team subtleties efficiently and at a faster pace
  • Understanding as to how to work with multiple levels of leadership
  • removing barriers and achieving project triumph
  • Finishing projects and handing them over to the concerned professionals
  • Specifying the scope of DMAIC projects and executing them.

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The Six Sigma methodology aims to remove defective business processes to save time with the help of Six Sigma tools and techniques. According to Six Sigma, employees work capability rises if the  Six Sigma rules are followed. Six Sigma can be used to improve upon business operations be it financial or otherwise, project management etc.Six Sigma gains more importance because of the fact that it is not limited to a specific type of industry.

During the Black Belt Upgrade course, delegates learn the complete and updated content every Six Sigma Black Belt professional must know. It describes how to detect errors and implement the core principals of Six Sigma. Any professional can take up this upgrade course only if he/she already possesses a Green Belt certification.

EXAM

The delegates, having completed their training, sit for a Multiple Choice Questions based exam. Each question carries four answers. The candidates are required to answer them correctly to get through the exam and obtain the certification.The candidates require 50% to get through this certification exam.

Type : Multiple Choice Question

Questions: 100

Pass Percentile: 50%

Language: English


PROGRAM CONTENT

  • Innovative ways
    • Management meeting
    • Charting of responsibilities
    • Wheel improvement
    • Change with emotional cycle
    • Running a critical issues workshop
  • Working with Advanced Tools
    • Balancing in work
    • RRS
    • Value stream mapping
    • Gage R&R
    • T & F test
    • Experiment designs
    • Charts with Advanced Controls
  • Managing operational performance
    • Performance Management Dashboard design
    • Using performance management Dashboard
    • Management meeting
    • Working with improvement wheel
    • Interpreting trends
    • Using visual management
    • Developing a business case
    • Reporting performance management
  • Leadership techniques
    • Five leadership principles
    • Constructing a high-performance team
    • Situational leadership
    • How to run quick win teams?
    • How to run rapid action teams?
    • T & F tests
    • Ways to manage resistance
    • Coaching and feedback
  • Working with capability analysis
    • Attribute data
    • Continuous regular data
    • Continuous non-normal data
  • Change Management
    • What is change management?
    • Project report outs
    • Value stream mapping exercise
    • Project management
  • Measurement system analysis
    • Introduction
    • Attribute agreement analysis
    • Continuous data
  • Working with techniques
    • Simulation exercise
    • Logistic regression
    • Control charts
    • Variable SPC techniques
    • Assign SPC techniques
    • Control methods
    • Introduction to surveys
    • DMAIC review & final report
    • Proportions testing
    • Mean and variance test
    • GOF contingency table
    • Sample size selection
    • One way ANOVA
    • Improve Phase roadmap
  • Working with designs
    • Getting Design of Experience familiarity
    • 2K fractional DOE Designs
    • Full factorial designs
    • 2K factorial designs
    • Attribute DOE
  • Project reviews
    • Introduction and meaning
    • Testing analysis assumptions
    • Minitab graphical techniques
    • Flow review
    • Theorem of central limit
    • Confidence intervals
    • Pull review

Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Exeter

Exeter is an ancient city located within the county of Devon England with a population of around 129,800 according to mid-2016 est. It is a cathedral city situated on the Exe River about 70 miles southwest of Bristol and 37 miles northeast of Plymouth. The status of the non-metropolitan district has been granted to the city under the rule of the County Council, while unitary authority status was abandoned under the command of coalition government 2010. The city was the most Roman fortified establishment of the southwestern Britain. The early history of the city dates back to the Roman era, although the remains of the Cornish tribe also survived in the city before the Roman Empire.

During the Medieval and Tudor period, the city became a major religious centre, and Exeter cathedral was also found in the middle of the 11th century. Post 16th century Protestant Reformation, the city followed Western Christian tradition and became Anglican. The city was affected by the First World War, although during Second World Was the city centre had undergone significant changes and must of the area was rebuilt. The city became a powerful wool trade centre by the end of the 19th century and now considered as an important centre for tourism and modern business. It has been suggested that the modern name of the city is derived from the anglicised form of the well-known river Exe. 

History

There is no major prehistoric evidence found in the city. The early settlement of the area was established on a dry ridge ending in a spur, and some coins were also discovered during the Mediterranean history. The 42-acre fort named Isca was built by the Romans in AD 55 and served as a base for the legion of the Imperial Roman army that founded during the late Roman republic. The city was commonly known as Isca Dumnoniorum in the Roman era. The fort accommodated the unplanned civilian community of the Celtic Britons and the families of the soldiers. The fortress was demolished, and the site was used for the civilian purposes. Excavation of the area was done in 1970, but due to its closeness with the Cathedral Church of Saint Peter, the site could not be opened for public view.

The Saxons named the city as Escanceaster, they arrived the city after beating the Dumnonians in Somerset and maintained the quarter of the city for Britons, known as Britayne Street till mid of the 16th century. The county corporate status was granted to the city in 1537. During the industrial era, the economy of the city was based on the agricultural products which were locally available. Its geographical location on the fast flowing river contributed towards the development of the early industrial site on drained marshland of the city. The Bristol and Exeter Railway has first arrived in the city in 1844, and the horse-drawn trams were introduced in 1882.

During the 20th century, a new bridge was built made of steel and cast iron and changed the old Georgian bridge. In early 1905, the horse drawn trams were replaced by the electric trams. Later on, with the rise in the traffic problems caused by the trams, these were further replaced by the double-decker buses in 1931. The city was the prime target by the German Luftwaffe during the Second World War resulted in the death of 156 people and demolition of many historic buildings including the Cathedral. After that, little efforts were executed to restore the heritage of the city, and the large areas of the city centre were rebuilt in 1950. The city was severally affected by the serious fireworks, leading to the destruction of the Royal Clarence Hotel and 18 Cathedral Yard.

Six Sigma and Its Techniques

Six Sigma is a set...