Primavera P6 Professional Advanced for Project Managers

Achieve advanced knowledge regarding Primavera Software

ABOUT THE PROGRAM

Management is the crucial part of every organisation. It includes planning, implementing, executing and monitoring the organisational services. Primavera is well-known software for managing and controlling the project activities. We at MSP introduces Primavera P6 Professional Advanced for Project Managers course to provide advanced knowledge regarding the Primavera software. This includes managing multiple projects at a time, assign constraints and planning budget.

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

Includes

Certificate

Delegates will get certification of completion at the end of the course.

PREREQUISITES

The professionals who want to attend this course must hold Primavera P6 Professional Fundamental certification.

TARGET AUDIENCE

Primavera P6 Professional Advanced for Project Managers course is best suited for the following audience:

  • Project Managers
  • Business Analysts
  • Operational Staff
  • Team Leaders
  • Programme Managers
  • Risk Managers

WHAT WILL YOU LEARN?

At the end of the training, the delegates will be able to:

  • Add activities and schedule various tasks
  • Create portfolio in Primavera P6
  • Effectively control and execute the project
  • Handle risk and challenges associated with the project
  • Plan and allocate resources for better output

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

This training programme includes practical knowledge of handling multiple projects at a time. The major topics included in the training are resource levelling, viewing, verifying portfolio performance, the creation of resources and role teams.

Primavera P6 helps in monitoring the progress and report mechanism of the project. It provides the following:

  • Clear picture of the project so that no misassumptions are there regarding project stages
  • Optimise time and resources in order to fast way the progress
  • Better understanding and handling of the project than before using Primavera Software
  • Manage vast and complex projects using this software
  • Handling multiple projects at a time to increase the productivity
  • It is demanding software that is used in construction, engineering, security, transport, aerospace and many more fields

PROGRAM CONTENT

Introduction: Earned Value Analysis

  • Define Earned Value Analysis
  • Planned Value, Earned Value and Actual Cost
  • Calculate complete performance percent

Overview of multiple projects management

  • Opening multiple projects
  • Setting default project

Introduction: Resources and Roles

  • Overview of roles and resources
  • Dictionary views
  • Assign role to a process
  • Allocate rates on roles
  • Assign Resources
  • Allocate resources
  • Adapt budgeted units/time
  • Investigate resources
  • Indicate the resource usage profile
  • Consume the Resource Usage Profile and Spreadsheet

Manually Allocation of Resources

  • An introduction to resource allocation
  • Displaying the assignments window
  • Detecting and editing allocation

Introduction: Schedule

  • An Introduction to Critical Path Method Scheduling and the Impact of Float
  • Accomplishment of Forwarding and Backwards passes
  • The out of Sequence activities
  • Describing Float

Introduction: Assign Constraints

  • Deliberating a general deadline to a Project
  • Smearing constraint to an activity

Introduction: Bucket Plan

  • An introduction to bucket planning
  • Removing Future Buckets
  • Use of Curves

Introduction: Leveling Resources

  • Introducing placing levelling options
  • Understanding priority levelling

Introduction: Advanced Scheduling

  • Scheduling multiple float paths
  • Introducing calendar effect on lag
  • Scheduling Out-of- Sequence methods

Introduction: Global Change

  • Creating user-defined field
  • Performing a global change

Introduction: Timescale logic diagrams

  • Choosing a template
  • How to filter data?

Understand user preferences

  • Introducing user preferences
  • Optional user preference settings

Activity Codes

  • An introduction to activity codes
  • How to generate and handle Global, EPS and Project level activity codes
  • Understanding User Defined Fields (UDFs)
  • Introducing project codes and resource codes

Global Change

  • How to bring global change?
  • How to generate named global change configurations?
  • Exporting and Importing global change configurations

Activity Steps

  • An introduction to activity steps
  • How to set up for a P6 Project for activity steps
  • Allocating steps to an activity
  • Generating an activity step template
  • Driving progress using steps

Customise Gantt Chart Bars

  • An introduction to the bars dialogue
  • Adapting existing Bars
  • Generating custom Bars based on filters
  • Introducing bar labels and other attributes of the Gantt Chart

Notebooks, WPs and Docs

  • An introduction to Notebooks, WP and docs
  • Addition of notebook topics to P6
  • Entering stories to P6 schedule actions
  • How to assign Work Products and Documents to P6 Projects?
  • How to assist WPs and Docs to schedule activities?

Issues and Risks

  • Understanding issues
  • How issues enter into your P6 Project
  • Managing risks in P6 Project

User Administration

  • An introduction to User Administration
  • Addition of users to the system
  • Introducing security profiles
  • An Introduction to Organizational Breakdown Structure (OBS)
  • Allocating user rights to Projects and WBS elements

General Administration

  • An introduction to administration
  • Understanding admin preferences and admin categories

Primavera P6 Professional Advanced for Project Managers Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Bath

Bath city is a largest city in the Lieutenancy areas of England. The city has geographical area of 11 squares miles with 88,859  population in 2011. The bath city is situated in the valley of the river Avon which is 97 miles west of capital city,London. The city is also near to Bristol town. This city is well-known for its hot springs, which further lead to Spa  Industry. On arrival of Romans, they built a temple and baths in the valley of river Avon. As per the previous records, the hot springs were present there since ancient time. But the site got explored when Romans entered the city. The 7th century, centre known as Bath Abbey went through renovations in 12th and 16th centuries. In 17th century, it became belief of local people that this water is special one and has so many curative properties. It brought both the popularity and tourists to the town. Apart from this, It offers a wide range of attractions including restaurants, businesses, theatres and city tours with 4.4 million visitors each year. The historic Roman Baths and Thermae Bath Spa giving their services to the city.

History

Earlier the motive of the Romans while constructing the bath was to used it for medicinal purposes. But the popularity of the water rose very quickly, so it was used for other purposes as well. In the medieval period, the wool industry went extra mile in production as  new equipment and tool were introduced .They focused in the industry well and took it to new height. The town get distinguished after the introduction of neoclassical Palladian art, literature, and building under regime of George I,II, and III in the 18th century . Romans used this bath for their Pleasure. Number of baths were built after one another. Most of them built near hot springs. The Minerva goddess temple also built alongside one bath. In 3rd century, Walls built near boundary to save it from attack. Following collapse of Roman Empire, the town expanded nearly 760. King Offa constructed  An abbey, dedicated to St. Peter. In the 15th century, the Abbey church of Bath city was broken down.

Culture

During the 18th century bath became the centre of fashionable life in England and attracted internationally renowned companies and directors with its five famous theatres. The city hosts the annual Bath International Music Festival and Mozartfest, the yearly Bath Literature Festival, and the Bath Film Festival.The Bath city is home to the Victoria Art Gallery (which is named after Queen Victoria), the Museum of East Asian Art, and Holburne Museum, as well as some other museums.

Climate

The climatic condition of Bath is far cry from rest of the country. The variation in the seasonal temperature is less as compared to the most of the United Kingdom due to adjacent sea temperature. In summer the maximum temperature is maximum to 21° C whereas minimum temperature goes to 1° or 2° C in winter. The average rainfall is near about 700mm with typically 8 to 15 days of snowfall.

Education

The Bath city has sufficient number of educational schools . It has two universities, the University of Bath which was established in 1996 offering programs in languages, engineering, architecture, politics etc. with 17,308 students out of which more than 30% are from outside the UK. Second is Bath Spa University which was given degree-awarding powers in 1992 and university status in 2005 offering courses leading to a Postgraduate certificate in education. The city has private and public schools, several sixth forms as part of state, Bath College, and one education college.

 

Project and its management

A project is a unique activity that has a tempo...