Primavera P6 Professional Advanced for Project Managers

Achieve advanced knowledge regarding Primavera Software

ABOUT THE PROGRAM

Management is the crucial part of every organisation. It includes planning, implementing, executing and monitoring the organisational services. Primavera is well-known software for managing and controlling the project activities. We at MSP introduces Primavera P6 Professional Advanced for Project Managers course to provide advanced knowledge regarding the Primavera software. This includes managing multiple projects at a time, assign constraints and planning budget.

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

Includes

Certificate

Delegates will get certification of completion at the end of the course.

PREREQUISITES

The professionals who want to attend this course must hold Primavera P6 Professional Fundamental certification.

TARGET AUDIENCE

Primavera P6 Professional Advanced for Project Managers course is best suited for the following audience:

  • Project Managers
  • Business Analysts
  • Operational Staff
  • Team Leaders
  • Programme Managers
  • Risk Managers

WHAT WILL YOU LEARN?

At the end of the training, the delegates will be able to:

  • Add activities and schedule various tasks
  • Create portfolio in Primavera P6
  • Effectively control and execute the project
  • Handle risk and challenges associated with the project
  • Plan and allocate resources for better output

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

This training programme includes practical knowledge of handling multiple projects at a time. The major topics included in the training are resource levelling, viewing, verifying portfolio performance, the creation of resources and role teams.

Primavera P6 helps in monitoring the progress and report mechanism of the project. It provides the following:

  • Clear picture of the project so that no misassumptions are there regarding project stages
  • Optimise time and resources in order to fast way the progress
  • Better understanding and handling of the project than before using Primavera Software
  • Manage vast and complex projects using this software
  • Handling multiple projects at a time to increase the productivity
  • It is demanding software that is used in construction, engineering, security, transport, aerospace and many more fields

PROGRAM CONTENT

Introduction: Earned Value Analysis

  • Define Earned Value Analysis
  • Planned Value, Earned Value and Actual Cost
  • Calculate complete performance percent

Overview of multiple projects management

  • Opening multiple projects
  • Setting default project

Introduction: Resources and Roles

  • Overview of roles and resources
  • Dictionary views
  • Assign role to a process
  • Allocate rates on roles
  • Assign Resources
  • Allocate resources
  • Adapt budgeted units/time
  • Investigate resources
  • Indicate the resource usage profile
  • Consume the Resource Usage Profile and Spreadsheet

Manually Allocation of Resources

  • An introduction to resource allocation
  • Displaying the assignments window
  • Detecting and editing allocation

Introduction: Schedule

  • An Introduction to Critical Path Method Scheduling and the Impact of Float
  • Accomplishment of Forwarding and Backwards passes
  • The out of Sequence activities
  • Describing Float

Introduction: Assign Constraints

  • Deliberating a general deadline to a Project
  • Smearing constraint to an activity

Introduction: Bucket Plan

  • An introduction to bucket planning
  • Removing Future Buckets
  • Use of Curves

Introduction: Leveling Resources

  • Introducing placing levelling options
  • Understanding priority levelling

Introduction: Advanced Scheduling

  • Scheduling multiple float paths
  • Introducing calendar effect on lag
  • Scheduling Out-of- Sequence methods

Introduction: Global Change

  • Creating user-defined field
  • Performing a global change

Introduction: Timescale logic diagrams

  • Choosing a template
  • How to filter data?

Understand user preferences

  • Introducing user preferences
  • Optional user preference settings

Activity Codes

  • An introduction to activity codes
  • How to generate and handle Global, EPS and Project level activity codes
  • Understanding User Defined Fields (UDFs)
  • Introducing project codes and resource codes

Global Change

  • How to bring global change?
  • How to generate named global change configurations?
  • Exporting and Importing global change configurations

Activity Steps

  • An introduction to activity steps
  • How to set up for a P6 Project for activity steps
  • Allocating steps to an activity
  • Generating an activity step template
  • Driving progress using steps

Customise Gantt Chart Bars

  • An introduction to the bars dialogue
  • Adapting existing Bars
  • Generating custom Bars based on filters
  • Introducing bar labels and other attributes of the Gantt Chart

Notebooks, WPs and Docs

  • An introduction to Notebooks, WP and docs
  • Addition of notebook topics to P6
  • Entering stories to P6 schedule actions
  • How to assign Work Products and Documents to P6 Projects?
  • How to assist WPs and Docs to schedule activities?

Issues and Risks

  • Understanding issues
  • How issues enter into your P6 Project
  • Managing risks in P6 Project

User Administration

  • An introduction to User Administration
  • Addition of users to the system
  • Introducing security profiles
  • An Introduction to Organizational Breakdown Structure (OBS)
  • Allocating user rights to Projects and WBS elements

General Administration

  • An introduction to administration
  • Understanding admin preferences and admin categories

Primavera P6 Professional Advanced for Project Managers Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Maidstone

Maidstone, also known as the Garden of England is a large county town of the Kent with a population of around 107,627 according to 2011 census. The Medway River flows in the west-east direction connect the town to the Thames Estuary and Rochester and passes through the centre of the town.  The town served as an agricultural county of Kent. The history of the city found its root back before the Stone Age.  The town was affected by the Second World War, and the heavy industries were replaced by light industries and services. It has been suggested that the name of the town is derived from medestan, meaning stone of the people or stone of the maidens.

The education, maintenance of infrastructure and social services of the town are administrated by the Kent County Council. There are two constituencies in the town, one is Faversham and Mid Kent, and other is Maidstone and the Weald. Maidstone comprises various villages, hitherto settlements and hamlets including Barming, Sandling, Allington and Tovil.

History

The evidence of Roman settlement in the area found in the architectural buildings and villas of the town. The charter was granted in 1551, created the town as a borough. The Normans established an abbey, shire moot, hospitals and a college for priests. The Parliamentarian troops won over the Royalist forces in the Battle of Maidstone during the Second English Civil War in 1648. The town flourished with the arrival of stone quarrying, paper mills, brewing and the cloth industry. The cavalry barracks were built in the town to establish the permanent military presence in the 17th century and also known as Invicta Park Barracks

A number of outlying settlements and villages can be found in the modern town. The significant development of the town Maidstone General Hospital, which was built in 1983 on the outskirts of the town replaced 150 years old West Kent General Hospital located in Marsham Street. The Portland stone was used during the construction of county council offices between 1910 and 1913.  During the Irish Republican Army campaign, local pub serving Invicta Park Barracks was severally damaged by a bomb in 1975.  The major employers of the town include administrative, retail and service sectors and few industrial estates established on the outskirts provide the employment to the workforce of the town. Some residents also commute to the other towns including London for better job opportunities.

Economy

The major employer of the town was the Sharps toffee factory located in the central Maidstone flows until 1998.  The electrical engineer founded he loudspeaker manufacturer in 1961 and named after Kent Engineering and Foundry (KEF). They manufactured a loudspeaker in the late 19th century and named the Maidstone. The water system of the town is operated by Mid Kent Water and Southern Water. The major offices of the county are located in the centre of the town and many high-tech firms have started their operations in the surrounding business parks.  The town is ranked 50 in the United Kingdom for having largest retail floor space and higher shopping yields. The main shopping centres Fremlin Walk and Mall Maidstone are located in the town centre having the floor area of 32,500 square meters and 49,700 square meters respectively. Other recent developments such as multiplex cinema, nightclubs, restaurants and market square are contributing towards the economy of the city.

Education

There are 23 primary, 15 secondary and two special schools in the town. The town is also served by the grammar schools, and non-selective secondary schools include Invicta Grammar School, Cornwallis Academy, New Line Learning Academy, Valley Park School, Maidstone Grammar School and Oakwood Park Grammar School. The regional campus of the University for the Creative Arts is located on the west of the town.

Project and its management

A project is a unique activity that has a tempo...